Project opportunities

Tourism, property development, major retail and miscellaneous projects

(Source: Construction Forecasting Council unless otherwise indicated)

Tourism or urban development project Estimated project value
$million
Stage Location
Qld region
776 Cairns Villa & Leisure Park Stage 1 & 2: Construction of 368 x 2 bedroom, 24 x 1 bedroom & 6 x 3 bedroom units in 2 stages. Stage 1 (9229sq m) 3 separate buildings. Stage 2 (31228sq m) 8 separate buildings. Parking for 598 cars & 225 bicycles. Associated landscaping. 80 Development Approval Far North
Alderley Square Mixed Development: Demolition of existing Alderley Plaza & construction of a mixed use centre with retail commercial space on lower levels & 234 units above. To include 3499sq m supermarket, 3121sq m specialty retail space, 2810sq m office space on fist floor & 9 levels of units above. 3 levels of basement parking. 65 Development Application SE Queensland
Alma Road Units & Commercial Building: Proposed construction of 176 units & 2 commercial areas totalling 500sqm. Units with range from 2 or 3 bedroom & 82.5sq m to 117sq m. 2 semi-basement carparks for 33 carparks for the commercial area & 43 carparks for visitors. Associated landscaping. 30 Sketch Plans SE Queensland
Ann Street Office Tower: Retention of heritage listed Ann Street Presbyterian Church, demolition of Interior House & Church Hall & construction of 37 storey office tower. 100 Construction SE Queensland
Australian Broadcasting Commission (ABC) Brisbane HQ: Construction commenced April 2010. Construction of 4 storey building. To include office space, recording & production studios & orchestra room. 52 Construction SE Queensland
Bloomfield Street Mixed Develoment Stage 1 – 3: Proposed construction of mixed use development with 18 commercial tenancies & 87 x 2 & 3 bedroom units in 3 stages. Stage 1 (3954sq m): 12 commercial tenancies & 17 units in 7 separate buildings. Stage 2: 12 duplexes & 1 x 3 storey building with 6 commercial tenancies on ground floor & 6 units above. Stage 3: 20 units in 8 separate buildings. Face brick, lightweight cladding, rendered block, aluminium framed windows & balustrades, metal roof. Parking for 136 cars. Associated landscaping. 22 Development Application SE Queensland
Blue Care - Azure Blue Kawana Lifestyle Community: Proposed construction of a retirement village & high care aged care facility. To include 96 residential aged care beds (Building no 1), 48 x 1 & 2 bedroom serviced apartments (Buildings 2a & 2b), 130 x 2 & 3 bedroom units (Buildings 3-8) & 74 x 2 & 3 bedroom single storey Independent Living Units (ILUs). Stage 1a to include ILUs across duplexes & triplexes & the 4 storey residential aged care building (no 1) with basement parking for 96 cars. Ground floor reception, foyer & admin offices. Services include laundry, kitchen with cold & store rooms, chemical store & maintenance workshop. Community facilities include hall with stage, cafe with bar & adjoining outdoor deck, cinema, meeting rooms, workshop/craft room, billiards room, library/internet room & hairdresser. Above 96 residential rooms with ensuite around a central dining room. Stage 1b to include 2 x 4 level buildings (nos 2a & 2b) each with 24 serviced units (16 x 1 bedroom & 8 x 2 bedroom). Stage 1c to include ILUs across duplexes & triplexes. Stage 1d to include 4 storey building 3 with 32 units & 4 storey building 4 with 16 units. Stage 2a to include 4 storey building 5 with 16 units & 4 storey building 8 with 18 units plus ILUs across duplexes & triplexes. Stage 2b is the 4 storey Building 6 with 16 units. Stage 2c is the 4 storey Building 7 with 32 units + ILUs across duplexes & triplexes. Associated landscaping. 60 Development Approval SE Queensland
Bribie Island Retirement Village: Proposed construction of 87 unit Retirement Village. Parking & associated landscaping. 20 Development Application SE Queensland
Brighton On Broadwater Mixed Development Stage A1 – Coral: Construction on a podium of a 40 storey tower with 456 residential units, a supermarket plus 22 retail & 19 commercial tenancies. Basement car parking. 100,000,000 Development Application SE Queensland
Broadwater Avenue Units: Construction of 80 x 2 bedroom units across 3 buildings. 30 units in building A, 29 units in building B & 21 units in building C. 102 basement level car parks & 11 ground level car parks to include visitor bays. Concrete slab & suspended concrete floors, poured concrete columns & walls, glass balustrades, metal roofing. 3,026sq m landscaping. 20 Development Approval SE Queensland
Broadway On The Mall Redevelopment & Office Tower: Upgrade of existing 3 storey retail arcade & construction of office tower. Expected start 2011. 120 Planning SE Queensland
Brooklyn Apartments: Construction of 15 storey residential building with 600sq m of retail space on ground floor & 186 units above. 65 x 1 bedroom, 41 x 2 bedroom & 80 x 2 bedroom, 2 bathroom units. Recreation facilities to include swimming pool & gymnasium. 4 levels basement parking. Associated landscaping. 80 Tenders/Submn Of Props For Design Construct SE Queensland
Buranda Transit Oriented Development: The proposed development consists of eight towers in total, four of these being substantial towers of 25 storeys in height. The development mix will provide close to 800 apartments, office space, retail, a hotel and related community facilities, received preliminary approval from Brisbane City Council August 2010. Source: www.anthonyjohngroup.com.au. 550 Committed SE Queensland
Centenary Highway Townhouses: Construction of 90 x 2 bedroom single storey townhouses & 40 x 3 bedroom 2 storey townhouses in 4 stages. Stage 1: 32 townhouses in 13 buildings. Stage 2: 28 townhouses in 10 buildings. Stage 3: 36 townhouses in 12 buildings. Stage 4: 24 townhouses in 7 buildings. Rendered concrete block, weatherboard cladding, rendered lightweight cladding, metal roof. Garages & carports. Associated landscaping. 25 Development Approval SE Queensland
Centrus Residential Development: Construction of 267 x 1 & 2 bedroom units in 4 separate buildings. Block A (6485sq m): 28 x 1 bedroom & 52 x 2 bedroom units. Block B (6093sq m): 28 x 1 bedroom & 52 x 2 bedroom units. Block C: 28 x 1 bedroom & 52 x 2 bedroom units. Block D: 13 x 1 bedroom & 14 x 2 bedroom units. Basement parking. Associated landscaping. 60 Development Approval SE Queensland
Cloverdale Street Units Stage 1 – 14: Proposed construction of 118 x 3 bedroom units in 50 separate buildings. Face brick, horizontal board cladding, battened sheet wall cladding concrete roof tiles. Garages. Total parking for 293 cars. 11080sq m landscaping. 50 Development Application SE Queensland
Coorparoo Junction Transit Oriented Development: High density mixed use development to be integrated with future busway station. 80 Tenders/Submn Of Props For Development SE Queensland
Creekwood Estate Units Stage 17: Proposed construction of apartments. Depending on density may involve 150-350 units. 90 Development Application SE Queensland
Duffield Road Townhouses: Proposed construction of 100 x 3 bedroom townhouses including Managers' residence. Parking & associated landscaping. 24 Development Application SE Queensland
Eden Hamilton Residential Development Affordable Housing Units: Demolition of existing industrial buildings & construction of 277 affordable housing units in 3 separate buildings. 160 x 2 bedroom, 18 x 3 bedroom & 99 x dual key units. Painted concrete, feature stone cladding, feature lightweight privacy screens, feature vertical aluminium blades, solid concrete balustrade. Parking for 344 cars. Swimming pool & gymnasium. Associated landscaping. 50 Tenders/Submn Of Props For Design Construct SE Queensland
Edmonton Business & Industry Park Precinct A: Mixed use homemakers centre including business facilities, business & technology park, limited shopping & tavern. 100 Planning Far North
Edmonton Business & Industry Park Hospital Precinct B: Proposed construction of a 350 bed 22 920sqm hospital in 2 stages, 1 586sqm ancillary hospital business facilities, 480sqm shopping across 4 buildings. Expected start 2012. 60 Planning Far North
Edmonton Business & Industry Park Precinct C: Proposed construction of showrooms, business facilities and shopping. 500 Planning Far North
EKKA Redevelopment: The redevelopment of the RNA Showgrounds will be a staged construction process over 15 years. Stage One, commencing in 2011, will include a major upgrade of the Industrial Pavilion. Further stages will include provision of modern animal pavilions, replacing the current obsolete facilities. The master plan includes a hotel and commercial, retail and residential buildings. Developer Lend Lease. 2,900 Planning SE Queensland
El Dorado Village Mixed Development: Construction of 2 towers above a central basement. 14 storey mixed use building with ground floor retail & 6 cinema complex (2454sq m), 3 levels of commercial space & 10 x 1 bedroom, 60 x 2 bedroom & 10 x 3 bedroom units above. Construction of separate 6 storey office building with restaurants & shops on ground floor & office space above. Recreation facilities include swimming pool, multi purpose room & gymnasium. 4 levels of basement parking. 50 Contract Under Negotiation SE Queensland
Elizabeth Street Hotel: Includes construction of a 27 storey 4 star hotel with 316 suites, restaurant, bars, meeting facilities and gymnasium. BCC approved development in May 2010. 90 Planning SE Queensland
Eilzabeth Street Office Tower: Proposed construction of 20 storey office tower with ground floor retail space. 90 Sketch Plans SE Queensland
Ella Bay Integrated Resort: The development will include 540 residences with golf course access, many with ocean or lagoon views; up to six resorts with prime ocean frontage and beach access; village precinct; Signature championship 18-hole golf course, and swimming lagoon. Satori Resorts Ella Bay Pty Ltd is responsible for the Ella Bay Integrated Resort Proposal. Expected start up 2010. Coordinator-General's report expecte Q2 2010. Sources: EIS and Ella Bay website. 1,400 EIS Far North
Endeavour Boulevard Units Stages 1-3: Proposed construction of 218 units over 3 stages. Stage 1; (6914sq m) 73 units. Stage 2; (6841sq m) 72 units. Stage 3; (7102sq m) 75 units. Bagged & painted brickworks. 3 swimming pools. Communal areas to include BBQ. Parking & associated landscaping. 40 Development Application SE Queensland
Esplanade Mixed Used Developments: Proposed construction 2 towers with 121 units, 8 shops between 72sq m & 118sq m, restaurant (233sq m). 1 caretakers units, 90 x 1 bedroom units, 27 x 2 bedroom & 4 x 3 bedroom. Covered parking for 268 cars. 2 x penthouses on level 7. Associated landscaping. 35 Development Approval Wide Bay-Burnett
Eulbertie Park Central Shopping Centre Extension Stages 2a 2b & 2c: Extension to existing shopping centre in 3 stages. Stage 2A to include extension to existing IGA supermarket; Stage 2B to include Woolworths supermarket with specialty shops; Stage 2C to include McDonalds. 800 Under study Mackay
Fryar Road Units Remaining Stages: Construction of low rise apartments buildings, 94 units, mixture of 1-3 bedroom units in 7 separate apartment blocks over 4 stages. Stage 2; 24 units. Stage 3; 46 units. Stage 4; 24 units. Total parking for 195 cars to include visitor car parks. Associated landscaping. 28 Development Approval SE Queensland
Gainsborough Greens: residential community of 6000 residents in 2300 dwellings: Feb 2008-2016 around a golf course. 950 Construction SE Queensland
Gasworks Precinct Commercial Tower: Proposed construction of 12 storey commercial tower (Tower G) within the gasworks precinct with 19032sq m office space & 945sq m retail space. 5 lower levels of commercial space & associated podium car parking in "H" shaped configuration with centrally located office tower above. Pre-cast concrete panels, alpolic cladding, vertical aluminium screens, feature tile wall. 2 levels of podium parking, 1 level basement parking. Associated landscaping. 55 Development Approval SE Queensland
Gladstone Central Plaza Apartments: Disposal of existing dwelling. Construction of a 9 storey building with 76 x 1, 2, 3 & 4 bedroom units. Reinforced concrete columns, painted concrete, solid concrete block & glass balustrades. Ground level & roof top swimming pool, sundeck & spa, barbecue area. Associated parking & landscaping. 27 Tenders Called/Regns Advertised Fitzroy
Gold Coast International Marine Precinct: The Master Plan for the Gold Coast International Marine Precinct is to extend the existing Gold Coast Marine Precinct. The land development consists of: Industrial use of 25.4 hectares including Marine industry, Ship lift industry and the new Maritimo facility; Mixed use precinct of 5.34 hectares; a TAFE college site of 1.57 hectares. A new 5 hectare boat building facility for Maritimo which will comprise a 12,500sqm built state of the art manufacturing facility. The stacked boat storage facility is state of the art with gantry crane access direct to the internal marina. This facility offers a secure dry store for approximately 290 boats and has associated facilities of showroom sales and brokering. A mix of buildings types of two and three level construction will house uses including the sales and display of marine parts; fittings and fixtures; corporate office space; small scale light industry; and service/recreational uses such as yacht club, restaurants and retail outlets to be located on the Marina river frontage. A 1.5 hectare TAFE college acts as a gateway building to the site and comprises a 3000sqm Centre of Excellence and a 1500sqm Workshop devoted to the training of skilled workers for the Marine Industry. Source: EIS. 530 Draft terms of reference public consultation 12 September 2011 to 7 October 2011 SE Queensland
Governor Terrace Residential Development: Construction of residential development with 9 x 3 storey townhouses, 39 x 2 storey townhouses & 1 x 5 storey residential building with 58 units. Rendered concrete, rendered fibre cement sheeting, weatherboard cladding, face brick to vertical blades, metal roof. Swimming pool. Associated parking & landscaping. 42 Development Approval SE Queensland
Great Keppel Island Resort: Tower Holdings has announced significantly scaled back plans for its proposed resort at Great Keppel Island off the central Queensland coast. Source: EIS. 1150 EIS in preparation Fitzroy
Gympie Road Units: Construction of 109 x 3 bedroom units in detached, duplex & triplex formation. Bagged & painted brick, lightweight cladding, powdercoated aluminium balustrades, concrete roof tiles. Garages. Associated landscaping. 38 Development Approval Wide Bay-Burnett
Herschel Street Units & Serviced Apartments: Construction of 77 storey mixed used building. To include 107sq m retail space on ground floor, with 349 units & 199 service apartments above. 23 x 1 bedroom, 32x 1 bedroom with media room, 232 x 2 bedroom, 40 x 2 bedroom with media room, & 22 x 3 bedroom units. 43 studio, 75 x 1 bedroom, 27 x 1 bedroom with media room & 54 x 2 bedroom serviced apartments. Prefabricated prefinished aluminium composite cladding, stone clad steel portal fins with glass wall recess, glass facade, composite clad vertical blades, polished black stone, translucent canopy, green walls. 11 levels basement parking. Recreational facilities to include 20m lap pool, spa, games room, gymnasium, residents theatre & barbecue facilities. Extensive landscaping incorporating water features 200,000,000 Site Preparation In Progress SE Queensland
Holy Spirit Boondall: 128 x 1,2 & 3 Bedroom Independent Living Units & 10 room aged care facility. 15m swimming pool & gymnasium. 22 Lowest/Preferred Tenderers Named SE Queensland
Hook Island Wilderness Resort Redevelopment: Laguna Island Adventures Pty Ltd (Laguna Adventures) is proposing to redevelop the Hook Island Wilderness resort located on Hook Island, approximately 20 kilometres from Shute Harbour in the Whitsunday Shire. The existing resort offers day facilities, holiday accommodation in the form of self contained rooms, a dormitory, a camping area, a jetty and an underwater observatory. The redevelopment resort is proposed to include day facilities (restaurant, shop and pool), 60 eco cabins, an eco-lodge with 40 units, 20 eco-tents, an upgraded underwater observatory and jetty, a helipad, an educational facility, a dive centre, resident staff accommodation, moorings, on-site waste water treatment plant and a renewable energy supply source. Source EIS. 50 On Hold Mackay
Hudson Road Mixed Development: Construction of 14 storey mixed use building with 752sqm retail space on ground floor & 133 units above. Recreation level with swimming pool, gymnasium & barbecue area. 3 levels basement parking. 50 Development Approval SE Queensland
Hummock Hill Island Development Project: Proposed construction of a residential and tourism development to accommodate a population of approximately 4,000 on Hummock Hill Island. The proposal also includes a golf course and an educational facility, the details of which are yet to be determined. EIS complete. Suppliers can register at http://www.hummockhill.com.au/suppliers.htm Source: www.hummockhill.com.au/ 635 Sales Fitzroy
i-METT: i-METT Queensland Group Pty Ltd (i-METT) proposes to redevelop about 600 hectares of rural land into a master planned development consisting of an integrated motorsport, education, tourism and technology precinct at Gilberton, near Ormeau in Gold Coast City. i-METT is a multifunctional project with a mix of facilities and technologies including an international standard motorsport facility, hotel, theme park, television and technology facility, educational institute and museum.  The project will also consider community based motorsport opportunities. Significant project status lapsed. Source: www.imett.com.au. 650 Approvals to be resubmitted SE Queensland
Indooroopilly Shopping Centre Extension Stage 7: Proposed extension to existing shopping centre. To include construction of additional department store, min major stores & specialty retail stores, redesign of existing department store, redesign & upgrade of existing food court, construction of new fresh food precinct, relocation of some major tenancies, redesign of existing loading docks & construction of new loading docks, upgrade of existing amenities & construction of new amenities. Extension of shopping centre across Stanford Road to accommodate new major retailers & loading dock, 2 basement levels & 3 roof top levels of parking on eastern extension. Council approved. Source: indooroopillyshopping.com.au. 300 Planning SE Queensland
James Cook University Discovery Rise: integrated academic, residential and commercial community that will revitalise JCU's Townsville campus over 20 years. Stage 1A (2010) Academic Core and Student Accommodation. Stage 1B (2011) Residential and Creative Gateway / Town Central. Stage 2 (mid 2012) Student Accommodation and Residential Learning Centre. Stage 3A (2014) Mixed Industry and business activities Hillside Residential. Stage 3B (2014) Student Accommodation. Stage 3C (2014) Village Residential. Stage 3D (2014) Creative Gateway. Stage 4 (2016) Mixed Industry and business activities Medium Density Residential. Source: www.discoveryrise.com.au. 1,000 Planning Northern
Jezzine Barrick redevelopment: Construction commencement November 2011 for completion August 2013. Source: www.townsville.qld.gov.au. 40 Procurement Northern
Jupiters Hotel & Casino Project Icon Alterations & Additions: Construction of extension to Junipers Casino & Hotel complex & extension redevelopment of some existing areas. To include infill construction between existing north & south towers to provide new 2000sq m main gaming floor, 1800sq m up-market dining precinct, 1800sq m premium gaming club above the Dining precinct, premium entertainment venue with new swimming pool & 1400sq m club. 400sq m extension to Atrium. Redevelopment of 5 existing restaurants (2800sq m). Refurbishment of 46 hotel penthouses & suites. Refurbishment of 400sq m Spa & Well-Being Centre. Alterations & extensions to theatre. Reinforced concrete/structural steel atop 13m high columns with piled foundations, lightweight structural steel with concealed metal deck roof, apolic cladding curtain glass walls New floor & ceiling finishes, new high quality air conditioning, lighting, fire & security services, 350 Tenders Called/Regns Advertised SE Queensland
Kalynda Chase Expected completion – 2013 200 Construction Northern
Kawana Town Centre: Master plan for the development of shopping centre, hotels, 300 approx apartments, commercial offices, restaurants, up to 800 homes, pedestrian bridge, extention of roads. 100 Early Planning SE Queensland
Kelvin Grove Urban Village Units: Construction of 367 units in 3 separate buildings on vacant site in 2 stages. 107 studio units, 42 x 1 bedroom, 191 x 2 bedroom & 27 x 3 bedroom. Stage 1 Building A (4969sq m): 6 storey building with 75 units. Basement parking for 92 cars. Stage 2 Building B (10209sq m): 4-12 storey building with 124 units. Basement parking for 168 cars. Stage 3 Building C: 10- 15 storey residential building with 168 units. Basement parking for 26 cars. Recreational facilities to include several lap, wad & rock pools, putting green, gymnasium, meeting rooms, communal theatre, barbecue facilities & covered seating areas. 70 Development Approval SE Queensland
Keppel Views: Multistage development of 1,600 residential blocks of land Yeppoon. Located at Tarangamba on the Capricorn Coast, a 20-year master- planned development of 1,200 residences and 70 apartments including an 18-hole golf course. Stage one completed. Stage two underway. 1,800 Construction Fitzroy
Labrador Park Urban Village: Proposed reconfiguration of existing 6445sq m Labrador Park Shopping Centre& construction of mixed used development with 180 units, 8 townhouses 518sq m medical centre 1415sq m office space, 818sq m restaurants, 461sq m takeway food outlets in 4 separate buildings. 8 x 2 storey towhouses to rear of existing shops. Construction of 2 mixed used buildings (1 x 5 storey & 1 x 4 storey) with commercial space on lower floors & units above wutg pedestrian link to existing retail centre. Removal of existing industrial buildings in Harley Street & construction of 2 mixed used buildings (1 x 3 storey & a x 8 storey) with commercial space on ground floor & units above. Recreation facilities to include swimming pool & barbecue area. Associated landscaping. 65 Development Application SE Queensland
Lakefront Crescent Uniits: Proposed construction of 4 residential towers with total of 120 units. Building 1: 8 storey building with 16 x 1 bedroom, 7 x 2 bedroom, 8 x 3 bedroom & 1 x 2 bedroom managers units. Building 2 & 3: 8 storey buildings each with 16 x 2 bedroom, 8 x 2 bedroom & 8 x 3 bedroom units. Building 4: 4 storey building with 4 x 1 bedroom & 20 x 1 bedroom with study units. Recreation facilities to include swimming pools, spa, gymnasium & barbecue area. Basement parking for 155 cars. Associated landscaping. 45 Development Application SE Queensland
Laxton Road Eco Resort: Construction of 546 accommodation units, minimum of 4 restaurants and shopping centre complex. Source: www.sunshinecoast.qld.gov.au. 800 Planning SE Queensland
Logan Road Mixed Development: Demolition of existing commercial building & construction of 10 storey mixed use building with 677sq m of retail space on ground floor & 87 units above. Concrete walls with textured rendered finish, full height shopfront glazing, feature curved glass screen with decorative printed pattern, feature wrapping blade, glass balustrade. Roof deck with cinema & barbecue area. 2 levels of basement parking. Associated landscaping. 30 Development Application SE Queensland
Longland Street Mixed Development Stage 2: Construction of 9 storey mixed use building with 2700sq m retail space on ground & first floor, recreation podium on level 2 with swimming pool, lap pool & barbecue area & construction of 2 towers above the podium with 185 units. Rendered concrete walls & columns, glass curtain wall panels, alpolic clad horizontal shading, metal cladding, powdercoated aluminum framed louvres. 1 level basement parking. Extensive landscaping & streetscaping. 28 Development Approval SE Queensland
Mackay East Tourist Resort: Proposed construction of tourist resort with 57 room motel & associated manager's residence. 149 serviced apartments. 14 beach houses & 483sq m resort shop. Associated parking & landscaping. 50 Development Application Mackay
Madison On Mayne Mixed Development: Proposed construction of 3 storey mixed use building with 770sq m retail space & 285 units above. Podium level recreation area to include swimming pool, gymnasium, multi purpose room, barbecue facilities, landscaped gardens & plaza. 2 levels basement parking. 90 Tenders/Submn Of Props For Design Construct SE Queensland
Marina Quays: staged development for a town centre and urban village with apartments, terraces, waterfront homes, retail and commercial space Completion – 2014. 2,500 Construction SE Queensland
Marina Shores Units & Marina: Proposed construction of 3 residential tower with total of 152 units & 40 berth marina. Building 1 (7776sq m): 6 storey building with 20x 1 bedroom, 31 x 2 bedroom & 11 x 3 bedroom units. Building 2: 6 storey building with 1 x 1 bedroom, 47 x 2 bedroom & 4 x 3 bedroom units. Building 3: 6 storey building with 19 x 1 bedroom, 14 x 2 bedroom & 5 x 3 bedroom units. Concrete walls with paint finish, concrete blade fins, glass balustrades. Basement parking. Recreation facilities to include swimming pool, sauna, spa, residents lounge, gymnasium & barbecue area. Associated landscaping. 75 Development Application SE Queensland
Marine Parade Luxury Unit Tower: Proposed construction of 27 storey units development to include 25 levels of residential units. 34 x 2 bedroom & study units, 40 x 3 bedroom units, 14 x 3 bedroom & study units. Ground floor to include 924sq m communal area. Sauna, sap, meeting room, residents lounge, gymnasium & cinema. Outdoor swimming pool & BBQ area (525sq m). 3 level basement parking for 190 cars. Loading bays. Curved concrete, powder coated, aluminium windows & screens, tinted & toughened glass, glazing, horizontal concrete ribs & vertical metalic fins. Associated landscaping. 30 Development Approval SE Queensland
Marine Parade Units: Construction of 117 unit in 2 separate buildings. 110 x 1 & 2 bedroom units in 11 storey tower & 2 storey building with 7 units. Basement parking. Swimming pool, plunge pool, indoor gymnasium, children's wading pool, small children's play area, adventure garden, recreation pavilion, roof top terrace and landscaped gardens. 45 Development Approval SE Queensland
Mayne Road Affordable Housing Units: Proposed construction of 24 storey residential tower with 520sq m retail space on ground floor (5 tenancies) & 242 affordable housing units. 1 x studio unit, 155x 1 bedroom & 8 x 2 bedroom units. Swimming pool. Gymnasium. Basement parking. Associated landscaping. 75 Development Application SE Queensland
Merivale Street Units: Proposed construction of 10 storey residential building with 32sq m retail tenancy & 15sq m managers office on ground floor & 60 units above. 36 x 2 bedroom (dual key) & 24 x 1 bedroom units. Rendered concrete, aluminium framed glass balustrade, feature glass curtain wall, powdercoated aluminium sunshades. Lifts. Swimming pool & gymnasium. Parking for 64 cars. Associated landscaping. 30 Development Application SE Queensland
Metro Ford Site Redevelopment Mixed Development Stage 2: Stage 2 redevelopment of the Metro Ford site. Stage 2 (Connor Building 19003sq m): 23 storey building with shops & restaurants on ground floor & 240 units above. Concrete columns, steel columns, insitu pre-cast concrete panels, shopfront glazing, steel framed awnings, operable louvre screens, fixed sun blades, glass balustrades. Basement parking. Swimming pool. Associated landscaping. 55 Site Preparation In Progress SE Queensland
Mirvac Hamilton Mixed Use Development Stage 1 – 3: Proposed construction of 582 x 1 & 2 bedroom units in 3 separate building & 1578sq m retail space in 3 stages. Stage 1: Building 1 (18819sq m) 23 storey building with retail tenancies on ground floor & 263 x 1 & 2 bedroom units. Stage 2: Building 2 (14433ssq m) 18 storey building with retail tenancies on ground floor & 200 x 1 & 2 bedroom units. Stage 3: Building 3 (7915sq m) 8 storey building with retail tenancies on ground floor & 119 x 1 & 2 bedroom units & single storey building (Building 4) with 314sq m retail space. 3 levels of basment parking. Recreational facilities to include swimming pool & barbecue area. 90 Development Application SE Queensland
Motorline City Precinct: project will take approximately five years to complete from start date construction of 12 new buildings including office and apartment buildings up to 25 storeys – 2008-16. Approved by Council. 400 Committed SE Queensland
Mount Cotton Road Units Remaining Stages: Proposed staged construction of 3 x 6 storey plus basement car parking residential buildings. Building 3 to have 15 x 2 bedroom & 10 x 3 bedroom units. Building 4 to have 42 x 2 bedroom & 10 x 3 bedroom units. Building 5 to have 30 x 2 bedroom & 15 x 3 bedroom units. 40 Development Approval SE Queensland
Nambour Shopping Centre: Development of the Morton Sugar Mill-2008 to 2012. Development application for a Coles supermarket and specialty shops has been lodged. 111 Approvals Wide Bay-Burnett
Northeast Business Park Project: residential, commercial and light industrial purposes, including a marina, golf course awaiting environment court outcome. 630 Committed SE Queensland
Ocean's Edge: Palm Cove residential resort: approximately ~350 lot resort residential community. 100 lot first stage completed end-2007 and ~40% sold; stage 1 houses under construction; forecast completion in stages to ~2012 110 Construction Far North
Old Coach Road & Days Road 83 Lot Subdivision & Units: 83 lot subdivision, ranging from 280sq m - 651sq m. 3 management lots, ranging from 2,216sq m - 4,373sq m. 2 areas for open space, 5,379sq m & 6,631sqm. 8 storey residential tower with 50 units. 7 storey apartment building with 32 units. 3 storey "walk up" buildings with 24 x 2 bedroom units. Private courtyards, terrace, ensuites & double garages. 33 Rezoning Approval SE Queensland
Oshen Apartments: Proposed construction of 35 x 1 bedroom, 23 x 2 bedroom & 2 x 3 bedroom units in a 6 storey building. Concrete floors, blockwork walls, metal roof. Swimming pool, gymnasium and associated landscaping. 25 Building Approval Fitzroy
Oshen Yeppoon: Proposed construction of 59 x 1, 2 & 3 bedroom dual key units. Associated parking & landscapiong. 35 Development Approval Fitzroy
Palmview: master-planned residential development - 7000 new homes. Development will be undertaken in stages over 15 years (2011 – 2026). 750 Committed SE Queensland
Paradise Point Waterfront Community and Marina Project: Master plan approved. Stage 1 470 dwellings near the prestige Sovereign and Ephraim islands. Hutchinson Builders has commenced work on a project known as Little Beach. Little Beach Paradise Point is a residential development comprising of five free standing apartment buildings which include 131 luxury apartments and commercial space. Construction Hutchinson. 650 Construction SE Queensland
Park Lane Mixed Use Development: Proposed construction of a 38 storey building to include 2,576sq m plaza/arcade on level 1. 1,284sq m commercial & retail on floors 1-4. 327sq m area adjacent level 4 commercial area for patrons associated with proposed commercial/retail uses. Level 5, 1,284sq m communal open space to include spa, bbq, deck area, wine storage area, theatre, games room, lounge & amenities. 255 units on levels 6-38 to include, 74 x 1 bedroom & study units, 57 x 2 bedroom units, 128 x 2 bedroom & study units & 79 x 3 bedroom units. Existing structures on site are Bowls Club & Tennis Club & Gold Coast Little Theatre. The theatre is to be partly demolished and renovation/extension of 505sq m to include new amenities, access ways, larger green room, storage areas & decrease of theatre viewing of 50 seats. 3 level basement car park for total of 300 spaces. 278 car parks for residents located on basement levels 2-6. 121 spaces for commercial/retail patrons located on basement levels 1 & 2. 19 visitors car parks on basement level 1. Applied rendered finish to feature concrete & to slab edge. Perforated aluminium cladding with powdercoated finish, anodised frames & power coated louvres. Clear glazing & glass awnings, rendered finish to concrete columns & exposed columns. Associated landscaping & pathways. 120,000,000 Development Approval SE Queensland
Persse Road Townhouses: Proposed construction of 60 x 3 bedroom townhouses in 30 separate buildings in 4 stages. Stage 1: 18 townhouses in 9 buildings. Stage 2: 16 townhouses in 8 buildings. Stage 3: 12 townhouses in 6 buildings. Stage 4: 16 townhouses in 8 buildings. Double garages. Concrete slab, timber frame, masonry block & lightweight cladding. Associated landscaping. 20 Development Approval SE Queensland
PGA Whitsunday Springs: 2500 mixed-density dwellings, including a hotel, apartments, residential allotments and a golf course – Planning approval granted by council in December 2006 start April 2009 to 2019. 700 Construction Mackay
Pine Road Units: Proposed construction of 135 x 3 bedroom units in detached, duplex, triplex & quadplex formation. Painted brick, lightweight cladding, metal roof. Garages. Total parking for 245 cars. Construction of internal roads. Associated landscaping. 30 Development Application SE Queensland
Portside Wharf Northshore Urban Village Residential Tower: Construction of 15 storey residential tower (Building 6) with Northshore Urban Village Sub-precinct 3C. Ground floor to include534sq m retail tenancies, foyer & reception area & residents library & internet lounge. 208 x studio, 1 & 2 bedroom units. 2 levels parking at podium & 1 level basement parking. Lifts. Associated landscaping. 60 Tenders/Submn Of Props For Design Construct SE Queensland
Progress Road Units: Proposed removal of 2 existing dwellings & construction of 134 x 3 bedroom units in 32 separate buildings. Textured brick, lightweight cladding, metal roof. Garages. Visitor parking. Associated landscaping. 30 Development Application SE Queensland
Promixa North Tower: Development to include 59 units, shops including food premises (410sq m) & office (440sq m). Parking. Associated landscaping. 20 Development Approval Fitzroy
Province Living Chermside: Construction of 10 storey residential building with 138sq cafe on ground floor 73 units above. 24 x 1 bedroom, 45 x 2 bedroom & 4 x 3 bedroom units. Rendered concrete block, reinforced concrete columns, glass balustrades. 2 lifts. 2 levels of basement parking. Swimming pool. Associated landscaping. 20 Building Approval SE Queensland
Residential Development, 146 Meiers Road, Indooroopilly QLD: the demolition of existing multi-storey buildings, cattle yards, greenhouses, carparks and other buildings associated with the previous CSIRO laboratories occupying the site; some clearing of vegetation as needed to create new public roads and development lots as per the proposed subdivision; bulk earthworks as required to create new public roads and provide for services as per the proposed subdivision; and new development to construct houses and multi-unit dwellings in the future subject to future applications. Source: www.environment.gov.au Not available EIS SE Queensland
Rocky Springs: planned community 2010-2046. Approximately 15,000 to 18,000 residential dwellings are currently proposed. Delfin Lend Lease developer. Approval expected this year. 4,500 Approvals Northern
RSL Care Caravonica Retirement Village Remaining Stages: Subdivision of 32.97ha parcel into a retirement village, 12.72ha of open space and 2.27ha commercial lot. The retirement village contains 12 residential precincts, a community centre building, vehicle camper/boat store area & a substantial water feature/lake. Remaining 209 single storey buildings with 2 bedrooms or 2 bedrooms plus study & single or double garages. Concrete slabs on ground, brick veneer walls, tile or metal rooves. Associated landscaping and parking for 309 cars and 15 bicycles. 30 Early Planning Far North
Scarborough Street Units: Proposed construction of 40 x 2 bedroom units & 20 x 1 bedroom units in a 7 storey building. 592sq m communal open space. Lifts, rendered concrete block walls & balconies, aluminium frames, metal deck roofing & colour coated metal. Parking for 68 cars & 40 bicycles. Associated landscaping. 25 Development Application SE Queensland
School Road Mixed Use Development Remaining Stages 30 Development Approval SE Queensland
Sea Pearl Mixed Development: Construction of 10 storey mixed used building with retail space on ground floor & level 1 & 23 units above. 58 Development Approval SE Queensland
Seachange Over 55 Lifestyle Development Stages 4 & 5: Proposed construction of lifestyle resort. Stages 4 & 5 to include 187 single & 2 storey houses (detached & attached). Associated parking & landscaping. 60 Rezoning Approval SE Queensland
Seachange Over 55 Lifestyle Resort Stages 2 & 3: Proposed 123 residential lots (stage 1= 61 lots, stage 2= 63 lots). Construction of 105 single & 2 storey houses with a mix of 2 & 3 bedrooms plus 16 x 3 storey terrace houses. 25 Development Application SE Queensland
Shute Harbour Marina Development: Shute Harbour Marina Development Pty Ltd proposes to construct an an integrated marina, resort hotel and residential community at Shute Harbour comprising a marina facility with 669 berths, 4 ½ star resort precinct, marina plaza, marina office and amenities, charter boat base, interpretive and cultural centre, managed resort accommodation on 117 freehold allotments, public esplanade and car parking facilities. Source: www.shuteharbourmarina.com. 300   Mackay
Sippy Downs Town Centre Mixed Use Development Stage 1: Construction of 6 storey mixed use development. Ground floor to provide Big W, Woolworths supermarket & specialty retail store, podium level carparking & 4 levels of student units above. 210 x 1, 2 & 3 bedroom units. 1 level basement parking. 35 Tenders/Submn Of Props For Design Construct SE Queensland
Southbank Townsville: The Southbank Townsville development will accommodate a mix of office and recreational facilities including apartment buildings from eight to 20 levels, low-rise townhouses and recreational facilities including an outdoor theatre. Leighton Properties and Devine JV. Scheduled to be rolled out over 10 years, the project has been divided into five sub-precincts and includes residential, commercial, retail, green space and green space built form for leisure and community uses. Once developed, it will contain a mix of 1100 dwellings to house around 2700 people covering a majority of the site. These include detached houses, three-storey townhouses and three unit blocks of up to 12-storeys. Source: www.leightonproperties.com.au. 1,200 Approved Northern
Southgate Stage II: It includes a luxury hotel, shops, gym, and corporate office space. Also included is a medium-density residential community comprising 110 units and townhouses priced from $271,000, set among parkland and next to the upmarket Parkhill housing estate. in the near city eastern suburbs of Brisbane. The masterplan for Southgate II is before the Brisbane City Council for planning approval, with a decision expected in October. See www.anthonyjohngroup.com.au. 1,000 Planning Approvals SE Queensland
Sunshine Cove Precinct development 1-4: mixed-use Maroochydore 2009-2014. Residential land being released. 500 Construction SE Queensland
Tannum Sands Residential Development: Multi unit residential (119) units in 2 medium rise towers & townhouse precinct. Low rise motel (60 rooms & restaurant), conference facility, hotel & bottle shop & reconfiguration into 3 lots. Swimming pool & lagoon pool. Landscaping. 50 Rezoning Application Fitzroy
The Apple Apartments: Construction of 15 storey residential building with 4 small retail tenancies on ground floor & 52 x 1 bedroom units abovel. Basement parking. Associated landscaping. 21 Tenders Called/Regns Advertised SE Queensland
The Chelsea Apartments: Construction of two linked residential towers Hamilton Place & Tufton Street. To include 133 x 1 bedroom & 61 x 2 bedroom units including 123 x 1 bedroom units under 60sq m for affordable housing. Gymnasium, sky & ground floor terraces, 116sq m shop on ground floor. Swimming pool. Basement parking for 194 cars, 16 motorcycles, & 194 bicycle spaces. 2 roof gardens & associated landscaping. 90 Contract Under Negotiation SE Queensland
The Foundry Home Centre: Demolition of some existing buildings on site, pattern shop, flour mill, moulding shop, former boiler house, Brookes shed, infill buildings & extension. Construction of Oxygen Hardware store (13,500sqm with 347sq m mezzanine), 2 x retail showrooms (4,900sq m). Refit of old canteen & administration building for boutique showrooms, retail, dining & gymnasium (500sq m). Refit of former Railway Hotel & extension for tavern & shop. Parking for 336 cars, disabled parking & bike. Associated landscaping. (Source: Construction Forecasting Council) 80 Development Application Darling Downs
The Midtown Apartments: Demolition of existing 3 storey building & construction of 25 storey residential tower with 142 x 1 & 2 bedroom units. Rendered concrete walls, concrete fins, reinforced concrete & glass balustrades, horizontal louvres. Swimming pool, gymnasium, barbecue area. Podium level parking. 60 Development Application SE Queensland
The Park At Palm Beach: Proposed constructon of 77 units. Parking & associated landscaping. 30 Rezoning Application SE Queensland
The Strand Mixed Use Redevelopment: Demolition of existing building & construction of a mixed use complex to include hotel with convention centre, 98 units, offices, shops & restaurants & associated parking for 265 cars. Landscaping. 40 Development Application Fitzroy
The Wave Mixed Development: Construction of 495 units in 5 separate buildings. Building 1, 8 storeys, Building 2 & 3 12 storey, Buildings 4, 6 storeys, Building 5 3 storey . Building 4 to include 375sq m supermarket & 2 restaurant tenancies on ground floor & Interpretive Centre allowing local artefacts currently stores off site to be returned for display Reinforced concrete columns, painted concrete wall panels, glass feature panels, powdercoated aluminium screens, solid concrete & glass balustrades, green arbour steel posts with timber cross members, prominent architectural treatment with public art screen. 2 levels basement parking. Swimming pool. Roof top gardens & sky lounges to each building. Extensive landscaping. 95 Development Approval SE Queensland
Treasury Casino Hotel & Upgrade: Construction of a new 400 room 5 star hotel on the former state library site. New events centre, ballroom, spa, nightclub, restaurants & private gaming room. Upgrade of exisitng gaming space & hotel rooms. Connecting walkway. 260 Early Planning SE Queensland
Tropical Paradise Resort: Tropical Resort Developments Pty Ltd proposes to establish a themed entertainment and tourist precinct, known as Tropical Paradise Resort, 18 kilometres south of Cairns. The proposal will incorporate a range of elements including: 2,500 EIS in preparation Far North
  • a major theme park and film studio
  • a water park
  • resort hotels and a mix of short stay accommodation
  • village centre and themed retail
  • golf driving range
  • extreme sports complex
  • other themed entertainment.
     
Source: EIS.      
Union Milton: transit-oriented and mixed-use development. Union is proposed to incorporate: 30-storey residential building comprising 213 – one, two and three bedroom apartments, 127 room, 4.5 star hotel , 10-storey office building comprising, 13,500 sqm of net lettable floor space, Prime podium and street frontage retail , and Multi-million dollar Milton Railway Station upgrade. Due for completion 2012. Developers FKP Commercial Developments Pty Ltd. Subject appeal lodged in the Planning and Environment Court. 300 Approved SE Queensland
University Of Queensland Campus Master Plans - St Lucia & Pinjarra Hills: St Lucia Campus has an on going development program that will increase the size of the academic core to over 277,000sqm usable floor area by 2013. Parts of the campus are listed o the Queensland State Heritage Register. The Pinjarra Hills campus is located 14 km to the west of the Brisbane CBD and has an area of approximately 282 hectares. The recent transfer of the university's Veterinary Science School from Pinjarra Hills to Gatton presents the university with an opportunity to plan for the future use of this site. The consultancy will include infrastructure , built & open space, & access planning . It is expected that specialist consultancy services will be required for an environmental impact assessments. 500 Tenders Called For Consultants SE Queensland
Verde Townsville Office Tower: Construction of 12 level office tower. To include 700sq m of retail space on ground floor & 11,000sq m A-grade office space above. Reinforced concrete columns, painted concrete panels, curtain glass wall panels, feature panels. Lifts. Associated parking & landscaping. 55 Tenders Called/Regns Advertised Northern
Victoria Street Units: Proposed construction of 7 storey residential building on vacant site with 107 x 1 & 2 bedroom units. Rendered & painted concrete walls, powdercoated aluminium framed glass balustrade, powdercoated aluminium sunhoods. Recreation facilities to include swimming pool, sauna & gymnasium. 3 levels basement parking. Associated landscaping. 35 Development Application SE Queensland
Volare Broadbeach Units & Mixed Use Development: Construction of 20 storey building with 108 units, 32 x 1 bedroom plus study & 76 x 2 bedroom. Landscaped terrace, 77sq m gymnasium & bbq terrace with rooftop swimming pool. 198sq m retail outlets on ground level. 235sq m art gallery on Level 2. 3 levels of basement parking for 144 cars & 135 bikes. Associated landscaping. 45 Development Approval SE Queensland
Waters Edge Residential Development Precincts 2 & 3 Mixed Development: Construction of 5 residential buildings in precinct 2 & 3 providing total of 525 units. Precinct 2: Building A (11336sq m) 10 - 14 storey building with 121 units & 213sq m commercial tenancy on ground floor. Building b (8582sq m) 8 - 12 storey building with 106 units. Building C (7333sq m) 2 - 12 storey building with 88 units. Building d (11304sq m) 10 - 12 storey building with 115 units. Precinct 3: Building E (10599sq m) 8 - 13 storey building with 651sq m retail space on ground floor, 1138sq m office space on first floor & 95 units above. Pre-cast concrete panels, concrete & glass balustrade, aluminium vertical screens, operable sun screens, metal entry awnings. Extensive landscaping. 2 levels of basement parking. 200,000,000 Development Approval SE Queensland
Watson Road Townhouses 40 Development Application SE Queensland
Wheller On The Park Units Stages 4a & B: Stage 4A: Construction of 5958sq m 6 storey building (Building F) with 48 units. Stage 4B: Construction of 7337sq m 5 storey building (Building G) with 60 units. Rendered concrete, fibre cement cladding, metal roof. Basement parking. Associated landscaping. 25 Tenders Called/Regns Advertised SE Queensland
Whitsunday Springs Development Remaining Stages: Master plan approval for the construction of a 150 room resort hotel with conference centre, recreations facilities, 18 hole golf course, clubhouse & restaurant & 2500 mixed density dwellings staged over 10 years. 800 Planning Mackay
Wickham Street Mixed Use Development: Partial demolition of heritage building & construction of a 12 storey mixed use development with a 4 storey podium. To include 56 x 1 bedroom & 54 x 2 bedrooom units & 429 sq m of commercial space on ground floor for use as offices, shops & restaurants. Concrete panels, rendered & painted concrete blades & upstands to front facade, powdercoated lauminium louvre, feature marble tile wall. 3 levels of basement parking for 88 cars & 39 bicycles. Associated landscaping. 55 Development Application SE Queensland
Woogaroo Street Over 50's Lifestyle Resort: Proposed construction of 232 relocatable home sites for the over 50's lifestyle park at Goodna. 150 Planning SE Queensland
Yarrabilba Master Development: master planned community start 2009-2039. Planning approval being sought. Following on from any approval of the initial application, a series of precinct and stage development plans will be lodged with Logan City Council. Queensland Government's has decided to progress the proposed multi-billion dollar Yarrabilba community in south-east Queensland as one of the state's first "model cities" facilitated by the Urban Land Development Authority. 9,000 Under Study SE Queensland
Yeerongpilly Landing Development: Mixed-use redevelopment of the Animal Research Institute Start – mid-2011. Currently Adco constructing BCC building. 850 Committed SE Queensland
Yeerongpilly transit oriented development: The plan of development for the Yeerongpilly transit oriented development is being prepared and will be finalised in mid 2011. Planning for some sites will occur earlier, including the release and development of sites between King Arthur Terrace and Ortive Streets in early 2011. These sites will most likely be used for low rise apartment buildings, showcasing subtropical design and environmental sustainability. Not Available Planning SE Queensland

back