Projects

Tourism and property development and major retail projects

If you are a Queensland manufacturer or related service provider looking for major project work make sure you are registered with ICN (QLD) or your existing registration is up to date.

If you are a Queensland small business in the building and construction industry, such as electrician, bricklayer, landscaper or builder, especially in regional Queensland, there is no need to register with ICN (Qld), just keep an eye out for project or opportunity briefing in your region.

If you are a buyer and need further assistance to optimize your project in Queensland make sure you contact ICN (QLD).

Tourism or urban development project Estimated project value Stage Location
Coconut Grove NQ three-level apartment development 43 Construction Far North
Ella Bay Integrated Resort: a proposal to transform a 450 hectare operating cattle station into a fully master planned, residential resort community over a ten to fifteen year period. 1400 Under Study Far North
Metricon Sea Haven Marina Development 130 Construction Far North
Ocean’s Edge residential resort 350 Construction Far North
Wallamurra Tower Completion – December 2008 two towers (five- and seven-storey) – 26 apartments and four commercial suites and one restaurant 20 Construction Far North
Aitkenvale Business Park: Stage 1 office building – Oct 2008-July 2009 42 Committed Northern
Flinders Mall Redevelopment 50 Under Study Northern
Gordon Street Mixed-Use Development Not Available Under Study Northern
Hayles Wharf: mixed-use development Flinders Street Townsville 66 Construction Northern
Itara at Riverway residential development 140.5 Construction Northern
Jezzine Barracks and Kissing Point Redevelopment: start March 2009 45 Under Study Northern
Kalynda Chase Expected completion – 2013 200 Construction Northern
Rocky Springs planned community 2009-2046 4500 Committed Northern
Strand Central residential, commercial and community development 70 Under Study Northern
T1 – Townsville City (Stage 2): Stage 1—T1-Sturt Street tower—18 stories, 24 two-bedroom and 24 three bedroom apartments, five three-bedroom penthouses and two shops Not available Under Study Northern
Waterway Gardens master-planned community 1000 Committed Northern
332 Waterson Way 163 resort-style apartments, conference facilities and retail development 102 Committed Mackay
390 Shute Harbour Road 2,000 m² retail, 100-bed backpackers, 24 apartments on five levels 40 Planning Mackay
Alfred Street: retail shops, commercial offices and a 166-room hotel. 65.8 Committed Mackay
Azucar: residential development 40 Committed Mackay
Bowen Marina: residential village, tavern, retail precinct, offices, new floating berths, and a specialised marine industrial area. 600 Committed Mackay
Bowen Range Estate Q: masterplanned estate 240 residential lots and aged care facility 72 Committed Mackay
Caneland Central Expansion 100 Under Study Mackay
Dent Island Golf Course Resort: The initial two and a half year phase will involve the construction of an 18-hole, international-standard golf course, major infrastructure and some apartments. Work on the course has started, with initial facilities expected to open in late 2008. Stage 1 = 2585 over (10 years) Construction Mackay
Funnel Bay: residential (400 apartments) and resort (200 rooms) project will incorporate a number of retail restaurant outlets 500 Committed Mackay
Gregory Street Seven-storey mixed-use development with 60 units, retail and dining 20 Under Study Mackay
Hook Island Wilderness Resort Redevelopment 50 EIS Mackay
Industry East Q: heavy-industrial park including hardstand, adjoining Hay Point Coal Terminal. 57.2 Committed Mackay
Industroplex: master-planned industrial precinct 84 Construction Mackay
Leichhardt on River: mixed use development completion early 2009 35 Construction Mackay
Mackay Q: Industrial land 117 Committed Mackay
Northern Beaches Central, Stage 2: existing shopping centre extension construction June 2009-Sept 2010 32 Committed Mackay
Peppers Coral Coast Resort Started – 2006. Completion – late 2009 76 Construction Mackay
PGA Whitsunday: 2500 mixed-density dwellings, including a hotel, apartments, residential allotments and a golf course – start April 2009. 700 Under Study Mackay
Ocean Isles: apartments, villas, boutique retail and office space, and residential lots. 100 Committed Mackay
River and Nelson streets: 112 apartments with retail and dining. 40 Committed Mackay
Riverside Car Park Redevelopment Major waterfront mixed-use development, including a vertical urban village including a major public parking facility 80 Under Study Mackay
Seafresh: seven-storey complex with a 60-room hotel and 30 apartments 45 Committed Mackay
Shoal Point Waters Small tourism precinct with commercial facilities, high density and low density residential developments expected start 2008 220 Committed Mackay
Shoreline Apartments 32 two and three-bedroom apartments with views across Pioneer Bay 20 Committed Mackay
Shute Harbour Marina Development: Development of an integrated 700-berth marina, commercial precinct comprising a 96-suite tourist resort, and a 115-lot residential community could start 2009. 250 Under Study Mackay
Tempo Lifestyles Airlie Beach: 50 luxury homes 51 Under Study Mackay
Tempo Lifestyles, Bucasia Beach Resort and Spa 51 Committed Mackay
The Australia Resort and Hotel 45 Under Study Mackay
The Beach First stage includes 33-lot subdivision and two residential/resort buildings 200 Committed Mackay
The Pier Residences: two residential towers 87 Committed Mackay
Whitsunday Springs mixed density dwellings 600 Committed Mackay
Augustus The 31.6 ha estate will comprise 324 Villa World brand house and land packages 123 Construction Wide Bay-Burnett
Bay Central Shopping Centre: Office, restaurant and shops (shopping centre) 40 Application Wide Bay-Burnett
Beach House Hotel Development 342 The Esplanade, Scarness. Three eight-storey buildings consisting of 91 units. Not available application approved subject to conditions Wide Bay-Burnett
Benchmark Supercentre: retail showrooms, shops, a service station, fast food outlets and indoor recreation facilities 65 Committed Wide Bay-Burnett
Urangan Boat Harbour Development: expansion of the harbour to the south of the existing breakwater, to include a new marina, with a minimum of 200 berths; a defined gateway to the boat harbour, through a major upgrade of Miller Street to create a boulevard entrance; redevelopment of existing car park and caravan park lots for a mix of tourism, commercial and residential infrastructure, and public car parking; improved public amenity, with a green corridor. Construction 2009 with completion by 2011. 800 Under Study Wide Bay-Burnett
Boyne Tannum Country Club Redevelopment 81.5 Development approval pending Fitzroy
Capricorn Green (The Observatory) Master-planned residential development—1,450 lots. Two commercial precincts and historic activity centre (conference and tourist accommodation) 600 Under Study Fitzroy
Cascade Gardens Residential, Commercial and Sports Centre Development 350 Construction Fitzroy
Central (formerly North Yards) The 5.8 ha site is to be developed for mixed use, and is part of the 36 ha former Townsville railway land. The new development will introduce up to 620 new units to the CBD 300 Construction Northern
Coral Cove master-planned community 153 Construction Wide Bay-Burnett
Curtis Island Beach Resort Staged development of 164 beachside apartments and villas 25 Construction Fitzroy
Gracemere Shoppingworld Start late 2008-completion 2009-10 30 Construction Fitzroy
Great Barrier Reef International Resort Total completion – around 2015 80 Construction Fitzroy
Gympie Pines Fairway Villas project completion – end of 2008 40 Construction Wide Bay-Burnett
Hummock Hill Island Development Project: Proposed construction of a residential and tourism development to accommodate a population of approximately 4,000 on Hummock Hill Island. The proposal also includes a golf course and an educational facility, the details of which are yet to be determined. 1,125 (over 15 years) Under Study Fitzroy
Keppel Bay Vista apartments and mixed commercial 36 Under Study Fitzroy
Keppel Views 20-year master-planned, multistage development of 1,600 residential blocks of land Yeppoon 1800 Construction Fitzroy
Nambour Shopping Centre: Development of the Morton Sugar Mill-2008 to 2012 111 Construction Wide Bay-Burnett
Ramada Resort Hervey Bay Construction started – January 2007. Expected completion – 2008 100 Construction Wide Bay-Burnett
Rockhampton Major Hotel and Apartment Development Major hotel and 233 apartments, restaurant and conference facility 100 Committed Fitzroy
Sansara Resort & Spa: To be built over three stages and features 107 residential apartments, including four bungalows, 18 retail shops, theatre and conference centre, swimming pool, gym and various resident facilities. 200 Construction Fitzroy
The Edge Apartments Mixed-use development incorporating restaurant, 41 dual key apartments, and 36 residential apartments. Completion – December 2008. 21 Committed Fitzroy
Waterfront 105 hotel suites with restaurant, shops and gymnasium, meeting rooms and swimming pool and 36 apartments 39 Under Study Wide Bay-Burnett
275 George Street Start – May 2007. Completion – May 2009 32-storey ‘A’-grade commercial office tower 500 Construction SE Queensland
400 George Street: 33-storey ‘A’ grade office development incorporating car parking for 221 cars. Completion – 2009. 400 Construction SE Queensland
480 Queen Street Trilogy Tower: Completion – November 2012 mixed-use development 750 Construction SE Queensland
Am-60: commercial office building completion October 2009 180 Construction SE Queensland
Aventura – Sunshine Coast Water Park: family tourist destination featuring a major water theme park, and conference, leisure, entertainment and accommodation facilities. 100 Under Study SE Queensland
Bellbrook Construction of homes. Total completion – 2011-12. 100 Construction SE Queensland
Brighton on Broadway Construction of 1,200 dwellings in four towers completion – March 2012 900 Construction SE Queensland
Brisbane Cruise Ship Terminal Expansion and residential development 176 Under Study SE Queensland
Buderim Multiple Dwelling Units and Four-Lot Subdivision 266 multiple dwelling units 20+ approval being processed SE Queensland
Buranda Development: residential, retail and commercial, entertainment, medical, and short-term accommodation 550 Committed SE Queensland
Caloundra Downs: large masterplanned community Not available Under Study SE Queensland
Calypso Bay The 30-berth first stage of the marina and waterfront completed – 2005. More development continuing over the next decade 1000 Construction SE Queensland
Cavalry Road: 450 lot sub-division adjacent to the new Sippy Downs Town Centre 81 Committed SE Queensland
Chancellor Village: 140 units in 4 buildings with 1500 sqm of home based business (HBO) retail, commercial and residents' recreational facilities. Completion July 2010. 70 Under Study SE Queensland
Citiswich: integrated industrial estate located within the Western Corridor. 300 Construction SE Queensland
Coomera Town Centre: Development expected to start – 2010. Proposed development of a new city commercial hub for 70,000 people on 60 ha of land, located around the Brisbane-Gold Coast Rail link (a greenfield Town Centre). 1,000+ Under Study SE Queensland
Coomera Waters Construction started – 2001. Expected completion – 2010. 546 Construction SE Queensland
Custom 20 modern terrace homes, 54 one, two and three bedroom apartments, and a 1,000 m2 retail and commercial precinct 54 Construction SE Queensland
Dolphin Tower 1 & 2 (Dolphin Arcade Redevelopment) Dolphin Tower 1 – 34-storeys, and Tower 2 – 57 storeys 700 Under Study SE Queensland
Energex Corporate Office: completion 2010 163 Construction SE Queensland
Everton Park Urban Village: 3 stages, Stage 1 retail-commercial start March 2009 400 Committed SE Queensland
Fairways at Brookwater: multi-staged development of highquality, architecturally designed residences close to Brookwater Golf Club 125 Construction SE Queensland
Fernbrooke: Master-planned residential community - 1000 detached residential homesites. 100+ Construction SE Queensland
Forest Pines: Masterplanned residential community 40+ Committed SE Queensland
Gainsborough Greens: residential community of 6000 residents in 2300 dwellings: Feb 2008-2016 950 Construction SE Queensland
Gasworks: Newstead residential, retail and commercial April 2008-May 2018 458 Committed SE Queensland
Gold Coast International Marine Precinct: marine industry facility adjacent to existing Gold Coast marine precinct 530 Under Study SE Queensland
Gold Coast Long-Term Accommodation Project Start – 2011. Completion – 2012 facilities to accommodate Council’s administrative, customer service, civic and cultural functions in the most effective manner in the longer term. 255 Under Study SE Queensland
Gold Coast Marine Development Project: elements of the project under consideration with preferred developer to be announced Feb 2009 300+ Committed SE Queensland
Hope Island Resort: Development of medium density residences now underway. Project completion – 2009 135 Construction SE Queensland
Horizon Shores Marina expansion: redevelopment will feature a luxurious resort village surrounding the marina 500 Construction SE Queensland
Hotel Gloria: Construction – 2009 50 Committed SE Queensland
i-METT: master-planned development - motorsport, education, tourism and technology precinct 650 Under Study SE Queensland
Insignia Towers Completion – 2009 Not available Construction SE Queensland
Kelvin Grove Urban Village: university campus integrated with surrounding retail, commercial and residential development. Various projects to 2010-11. 1000 Construction SE Queensland
Marina Quays Completion – 2014 1500 SE Queensland
Mariners Cove Broadwater Harbour Development 400 Under review SE Queensland
Metro: high-density, mixed-use commercial, residential and retail development on Sunshine Coast – DA Feb 2009. 200 Under Study SE Queensland
Motorline City Precinct project will take approximately five years to complete from start date construction of 12 new buildings including office and apartment buildings up to 25 storeys – 2008-16 400 Under Study SE Queensland
Newstead Riverpark retail and commercial precinct, comprising four buildings and around 440 apartments located in seven buildings 300 Under Study SE Queensland
Noosa Civic, Stage 3: Retail and commercial development 310 Committed SE Queensland
North Bridge A 32-storey ‘A’ Grade commercial office building incorporating 350 Construction SE Queensland
Northeast Business Park Project: residential, commercial and light industrial purposes, including a marina, golf course 630 Under Study SE Queensland
North Lakes Development of a new master planned Community Expected completion – 2012 2,200+ Construction SE Queensland
North Shore 270 Ocean Drive, Mudjimba. Villas and residential houses 30 Under Study SE Queensland
Northshore Hamilton Development urban renewal project Started – mid-2006. Completion – 2011-12 2,000+ Construction SE Queensland
Orion Shopping Centre (Stage 2) four-stage project within the Greater Springfield Gateway CBD 103.3 Construction SE Queensland
Ormeau Shopping Centre Stage 1 46.3 Construction SE Queensland
Palmview: master-planned residential development - 7000 new homes expected start 2011 750 Committed SE Queensland
Paradise Point Waterfront Community and Marina Project Master plan approved. Stage 1 470 dwellings near the prestige Sovereign and Ephraim islands 270 Under application SE Queensland
Peregian Master-Planned Community 20+ Under Study SE Queensland
Petrie Terrace Old Police Barracks Redevelopment Started – February 2007. Completion – September 2008 120 Construction SE Queensland
Raptis Plaza Apartments A & B – 27 and 29 storeys respectively Not available Under Study SE Queensland
Ripley Valley Residential Development Construction start – 2010. Includes town centre, commercial, residential, recreational and industrial zones Not available Committed SE Queensland
Riverpoint Apartments: 300 residential apartments. 300 Committed SE Queensland
Settlers Cove Completion of remaining apartments (142 in total) – end of 2011 200 Construction SE Queensland
Soul Tower Started – April-May 2007. Completion – 2010 850 Construction SE Queensland
Stockland Eagle Street Pier Construction – after 2008 300 Under Study SE Queensland
Sunshine Cove Precinct 1: mixed-use start 2008 147 Committed SE Queensland
Sunshine Cove Precinct 4: mixed-use Maroochydore 2009-2014 350 Under Study SE Queensland
Sunshine Cove Precinct 5: 80 residential units 2011-2012 51 Under Study SE Queensland
Sunshine Cove Precinct 7: 230 residential site area 2011-2017 119 Under Study SE Queensland
The Glades Residences Development of a 110 ha site surrounding a Greg Norman-designed golf course, owned by Edwin Yu. 500 Construction SE Queensland
The Mill (Albion): village-style development 300 Construction SE Queensland
Tennyson Riverside Development: The new State Tennis Centre at Tennyson, Brisbane, will feature an international-standard roofed centre court with 5500 permanent seats and associated corporate facilities. It will also have two show courts seating 1500 spectators and 20 match and training courts. The development will include administrative and commercial facilities, including Tennis Queensland's new headquarters, a pro shop, cafe, change rooms and function rooms. This will be complemented by Mirvac's associated development which includes more than 390 residential apartments, a gymnasium and parkland that will provide public access to a scenic stretch of the Brisbane River. Tennis Centre is $82m due for completion Dec 2008. 540 Construction SE Queensland
Tyto Precinct Project: forms the bulk of the $34.5M Ingham revitalisation strategy. It seeks to restore the historical and cultural significance of the CBD. The precinct would link the Tyto Interpretative Centre to the Lannercost Street business centre via a pedestrian promenade and all-weather walkway. 21 Under Study Northern
Union Milton: transit-oriented and mixed-use development 244 Committed SE Queensland
Urangan Boat Harbour Development: expansion of the harbour to the south of the existing breakwater, to include a new marina, with a minimum of 200 berths; a defined gateway to the boat harbour, through a major upgrade of Miller Street to create a boulevard entrance; redevelopment of existing car park and caravan park lots for a mix of tourism, commercial and residential infrastructure, and public car parking; improved public amenity, with a green corridor. Construction 2009 with completion by 2011. 800 Under Study Wide Bay-Burnett
Varsity Lakes Complex Started – 1999. Completion – 2010 Development of a high-tech community 1000 Construction SE Queensland
Viridian Resort & Spa (Stage 3) Completion – late 2009-early 2010 resort village with 192 villas and apartments located in 11 separate buildings onsite, centred around the 5-star resort and conference facilities 300 Construction SE Queensland
Vision Completion – 2010 mixed-use development of offices, 900 Construction SE Queensland
retail and apartments
Waterfront Newstead: Residential retail and parkland precinct. 775 Construction SE Queensland
Weyba Downs Retirement Village & Residential Care Facility Proposed retirement village and residential care facility 20+ Under Study SE Queensland
Woodlands Project Launched – September 2005. Development ongoing, completion – 2010 250 Construction SE Queensland
Yarrabilba Master Development start around 2016 4,000 (over 30 years) Under Study SE Queensland
Yeerongpilly Landing Development: Mixed-use redevelopment of the Animal Research Institute Start – mid-2010 850 Committed SE Queensland

back