| Road project |
Estimated project value |
Stage |
Location |
| Airport Link: (Airport Link website): Bowen Hills - Toombul includes two 3-lane tunnels between Bowen Hills and Kedron, two 2-lane tunnels between Kedron and Toombul. Will be developed as a PPP. Start 2008, Finish 2012. Lutwyche Kedron Sector to be built by same constructor as Northern Busway |
3400 |
Detailed Engineering |
SE Queensland |
| Brighton - Redcliffe Road |
315 |
Basic Engineering |
SE Queensland |
| Brisbane Urban Corridor (Griffith Arterial): staged upgrade over the next three to five years subjet to federal funding |
991 |
Committed |
SE Queensland |
| Bruce Highway: Boundary Road to Caboolture |
411 |
Construction |
SE Queensland |
| Bruce Highway – Caboolture: Uhlmann Road - Caboolture, widen 4 to 6 lanes |
183 |
Basic Engineering |
SE Queensland |
| Bruce Highway – Gympie: Gympie urban section, Kidgell Street-Pine Street, duplicate 2 to 4 lanes. Stage 2 construction commenced in May 2008 and is expected to be finished by early 2009 |
71 |
Construction |
Wide Bay-Burnett |
| Bruce Highway: Ingham to Innisfail |
172 |
Construction |
Far North-Northern |
| Bruce Highway: Innisfail to Cairns (Sheehy Road to Ray Jones Drive) |
150+ |
Committed |
Far North |
| Bruce Highway Mulgrave River, bridge construction |
50 |
Basic Engineering |
Far North |
| Bruce Highway: Brisbane to Gympie (Nambour) |
35 |
Detailed Engineering |
SE Queensland |
| Bruce Highway - Townsville Ring Road Stages 2 and 3, Upper Ross River Road - Shaw Road, construct to new sealed 2 lane standard |
119 |
Construction |
Northern |
| Bruce Highway: Townsville to Ingham (Woodlands Shopping Centre—Veales Road) |
50 |
Construction |
Northern |
| Bruce Highway Upgrade: Cooroy to Gympie |
3300 |
Basic Engineering |
SE Queensland- Wide Bay Burnett |
| Bundaberg Ring Road |
92 |
Basic Engineering |
Wide Bay-Burnett |
| Bruce Highway – Tully: Corduroy Creek - Banyan Creek, Tully, realign 2 lanes |
173 |
Basic Engineering |
Far North |
| Burleigh Connection Road: Mattocks Road to Kortum Drive improvements |
40 |
Basic Engineering |
SE Queensland |
| Burpengary–Caboolture Road (Morayfield Road) |
149 |
Committed |
SE Queensland |
| Caboolture–Bribie Island Road |
47.5 |
Basic Engineering |
SE Queensland |
| Caloundra Road Upgrade |
80 |
Construction |
SE Queensland |
| Caloundra–Mooloolaba Road: preliminary works |
64 |
Basic Engineering |
SE Queensland |
| Caloundra–Mooloolaba Road: new 2 lane link |
75 |
Construction |
SE Queensland |
| Capricorn Highway Bushley new bridge |
14.3 |
Committed |
Fitzroy |
| Centenary Highway Bus Priority/Transit |
310 |
Basic Engineering |
SE Queensland |
| LanesCentenary Highway Four Lanes: Ipswich Motorway to Springfield |
1170 |
Basic Engineering |
SE Queensland |
| Centenary Highway Two Lanes: Springfield to Yamanto |
366 |
Construction |
SE Queensland |
| Cunningham Highway Four Lanes: Ripley Road to Ebenezer |
900 |
Basic Engineering |
SE Queensland |
| Cunningham Highway to Warrego Highway Connection: subject to federal funding |
127 |
Committed |
SE Queensland |
| D’Aguilar Highway |
6.3 |
Basic Engineering |
SE Queensland |
| Dawson Highway: deviation at the Calliope Range start May 2009 |
70 |
Detailed Engineering |
Fitzroy |
| Diamantina Development Road: Ward River and Woolshed Gully, replace bridge and approaches. |
11 |
Basic Engineering |
Central West-South West |
| East–West Links: Glass House Mountains Road start 2008-09 |
106 |
Detailed Engineering |
SE Queensland |
| Flinders Highway Upgrade: Jardine Valley (214.0-226.1km), Charters Towers-Hughenden, rehabilitate and widen |
6 |
Basic Engineering |
Northern – North West |
| Gateway Upgrade Project |
1833 |
Construction |
SE Queensland |
| Gregory Development Road: Charters Towers - The Lynd, 1 km south of Airport Road - 8km north of East Paddy Creek, widen existing pavement |
7 |
Basic Engineering |
Northern |
| Gregory Development Road: Stage II Charters Towers - The Lynd, 2.7km north of One Mile Gin Creek - 300m south of Ryans Creek, widen existing pavement |
7 |
Basic Engineering |
Northern |
| Hale Street Bridge |
241 |
Construction |
SE Queensland |
| Harvey Bay Road |
29.5 |
Construction |
Wide Bay-Burnett |
| Herveys Range Development Road: Townsville - Battery, Blackhawk Boulevard - Bohle River, duplicate 2 to 4 lanes |
14.52 |
Basic Engineering |
Northern |
| Homebush Road, Mackay |
8 |
Basic Engineering |
Mackay |
| Hope Island Road |
109 |
Basic Engineering |
SE Queensland |
| Hope Island Road 2 |
31 |
Basic Engineering |
SE Queensland |
| Houghton Highway bridge and approaches |
315 |
Construction |
SE Queensland |
| Ipswich Motorway - Goodna Bypass |
2300 |
Basic Engineering |
SE Queensland |
| Ipswich Motorway - Logan Motorway Interchange |
255 |
Construction |
SE Queensland |
| Ipswich Motorway Upgrade: Wacol to Darra |
320 |
Construction |
SE Queensland |
| Kennedy Highway |
14 |
Basic Engineering |
Far North |
| Leichardt Highway: Westwood - Taroom, Dawson River - Twelve Mile Creek, widen existing pavement |
6 |
Basic Engineering |
Fitzroy – Darling Downs |
| Leichardt Highway 2: Westwood - Taroom, north of Dawson Park Road, widen existing pavement |
7 |
Basic Engineering |
Fitzroy – Darling Downs |
| Logan Motorway Upgrade: Ipswich Motorway to Gateway Motorway |
3600 |
Basic Engineering |
SE Queensland |
| Mackay Bypass: Hospital Bridge, construct bridge and approaches |
33.618 |
Basic Engineering |
Mackay |
| Maryborough - Hervey Bay Road: Torbanlea turnoff - McNally Street, duplicate 2 to 4 lanes |
26 |
Basic Engineering |
Wide Bay-Burnett |
| Millmerran - Inglewood Road |
14 |
Basic Engineering |
Darling Downs |
| Mount Lindesay Arterial |
113.2 |
Basic Engineering |
SE Queensland |
| Mount Lindesay Highway |
90 |
Basic Engineering |
SE Queensland |
| New England Highway |
27 |
Basic Engineering |
SE Queensland |
| Northern Link—Toowong to Kelvin Grove: proposed underground, twin, two-lane toll road between the Western Freeway in Toowong and the Inner City Bypass at Kelvin Grove |
1800 |
EIS |
SE Queensland |
| North-South Bypass Tunnel (Clem Jones Tunnel): two parallel tunnels (one for northbound traffic and one for southbound traffic) about 5 km in length. The tunnels run under the Brisbane River and to link to the Inner City Bypass and Lutwyche Road at Bowen Hills in the north, and with the Pacific Motorway and Ipswich Road at Woolloongabba in the south. |
3400 |
Construction |
SE Queensland |
| North Ward Road, Townsville: Walker Street - Gregory Street, duplicate 2 to 4 lanes |
34 |
Basic Engineering |
Northern |
| Pacific Motorway (Coomera): Construction of an interchange on the Pacific Motorway at Coomera |
160 |
Planning |
SE Queensland |
| Pacific Highway (Mudgeeraba) |
60 |
Detailed Engineering |
SE Queensland |
| Pacific Motorway (Nerang to Stewart Road): Six-lane upgrade and interchange upgrades on the Pacific Motorway south of Nerang to Stewart Road at Tugun |
600 |
Planning |
SE Queensland |
| Pacific Motorway (Rochedale to Loganlea): Eight-lane upgrade of the Pacific Motorway between the Gateway Motorway at Rochedale and the Logan Motorway at Loganlea, including interchange upgrade at Loganlea Road |
492.9 |
Planning |
SE Queensland |
| Peninsula Development Road: Coen - Weipa, construct to sealed standard on various sections |
21.379 |
Basic Engineering |
Far North |
| Pormpuraaw various roads, restoration works |
4 |
Ongoing |
Far North |
| Port of Brisbane Motorway: Stage 2 |
1300 |
Preliminary Design |
SE Queensland |
| Redland Bay Road Upgrade: Start 2010 |
73 |
Committed |
SE Queensland |
| Redland Subarterial: Start Nov 2009 |
37.7 |
Committed |
SE Queensland |
| Rockleigh - North Mackay Road |
14 |
Basic Engineering |
Mackay |
| Roma - Taroom Road |
12.163 |
Basic Engineering |
South West |
| Roma - Taroom Road 2 |
17.5 |
Basic Engineering |
South West |
| Slade Point Road (new bridge and approaches) |
127.99 |
Construction |
Mackay |
| Smith Street Connection Road |
68 |
Basic Engineering |
SE Queensland |
| Southport–Nerang Road: start 2009 |
85 |
Basic Engineering |
SE Queensland |
| South West Arterial: Construction of a two-lane sealed standard, between Springfield and Yamanto. |
366 |
Construction |
SE Queensland |
| Sunshine Motorway Upgrade - Maroochydore Road to Pacific Paradise |
235 |
Construction |
SE Queensland |
| Sunshine Motorway - Pacific Paradise interchange |
85 |
Basic Engineering |
SE Queensland |
| Sunshine Motorway Extension: Mooloolah River to Kawana Way |
140 |
Committed |
SE Queensland |
| Sunshine Motorway: Mooloolaba to Peregian |
85 |
Construction |
SE Queensland |
| Sunshine Motorway: Mooloolaba to Peregian (Maroochydore to Pacific Paradise) |
104 |
Construction |
SE Queensland |
| Sunshine Motorway: Tanawha to Mooloolaba |
66 |
Construction |
SE Queensland |
| Warrego Highway–Brisbane Valley Interchange |
254 |
Basic Engineering |
SE Queensland |
| Warrego Highway - Mitchell |
6 |
Basic Engineering |
South West |
| Warrego Highway – Toowoomba: Toowoomba Bypass |
10 |
Basic Engineering |
Darling Downs |
| Wills Development Road: Gregory - Doomadgee turnoff, pave and seal |
7.5 |
Basic Engineering |
North West |