| Rail project |
Estimated project value |
Stage |
Location |
| 12 and 16 Cylinder Loco Overhauls - Coal |
80 |
In production |
Fitzroy |
| 12 and 16 Cylinder Loco Overhauls - Bulk Freight |
10.54 |
In production |
SE Queensland |
| 12 and 16 Cylinder Loco Overhauls - Regional Freight |
22.457 |
In production |
SE Queensland |
| 15 x 4000 Class Locomotives |
93.062 |
In production |
Wide Bay-Burnett |
| 15 New Diesel Locomotives (4100 Class) |
87.395 |
In production |
Wide Bay-Burnett |
| 510 VCA Coal Wagons: 510 wagons and 340 bogies expected completion 2008-09. |
113 |
In production |
Various |
| 770 VCA (106 tonne) Coal Wagons: Fabrication of 770 VCA (106 tonne) Coal Wagons. |
165 |
In production |
SE Queensland-Northern |
| 1,190 New Coal Wagons (VCA 106 tonne): Fabrication of 1190 coal wagons expected completion 2009-10. |
159.281 |
In production |
SE Queensland |
| 24 Locos upgrade to 2250 Class |
57 |
In production |
SE Queensland |
| Albion Station Land Bridge (QR) |
11 |
Detailed Engineering |
SE Queensland |
| Aroona to Duaringa Duplication: expected completion 2009-10 |
35 |
Construction |
Fitzroy |
| Australian Inland Rail Expressway (AIRE): Melbourne to Toowoomba inland railway to link Melbourne and Darwin via NSW and Queensland |
3000 |
Under Study |
Darling Downs |
| Beenleigh to Gold Coast Rail Corridor Upgrade |
350 |
Construction |
SE Queensland |
| Beerburrum to Landsborough Track Duplication |
354 |
Construction |
SE Queensland |
| Beerwah Rail Crossing Grade Separation: expected completion June 2009 |
70 |
Construction |
SE Queensland |
| Beerwah to Maroochydore Rail Line: Construction of a new spur line |
3116 |
Under Study |
SE Queensland |
| Blackwater to Burngrove Rail Duplication |
43 |
Construction |
Fitzroy |
| Bluff to Blackwater Rail Duplication |
59 |
Construction |
Fitzroy |
| Bolingbroke Feeder Station (QR) |
29.9 |
Committed |
Mackay |
| Bridge Replacement Stage 3 (Transport Service Contract II): Replacement of life-expired and maintenance-intensive bridges completion 2010-11 |
63 |
Construction |
Statewide |
| Brigalow to Tarong Rail Line Subject to feasibility studies and commercial negotiations on alternative coal source options |
500 |
Under Study |
Darling Downs-Wide Bay-Burnett |
| Brisbane Metro: Minimum Maintenance Track (Transport Service Contract II) completion 2010-11 |
51 |
Implementation |
SE Queensland |
| Broadlea - Mallawa - Wotonga Duplication expected completion 2009-10. |
88 |
Detailed Engineering |
Mackay |
| Caboolture to Beerburrum Rail Upgrade: Duplicate the rail line for 14 km |
298 |
Detailed Engineering |
SE Queensland |
| Caboolture to Beerburrum to Landsborough Duplication |
652 |
Detailed Engineering |
SE Queensland |
| Callemondah 3rd Spur |
40.506 |
Construction |
Fitzroy |
| Central Qld Coal Formation (QR): strengthening Stage 2 |
20.538 |
Implementation |
Various |
| Citytrain Disability Standards 2007 Compliance: Infrastructure |
83 |
Implementation |
Various |
| Citytrain Disability Standards 2007 Compliance: Rollingstock (QR Redbank) |
48 |
Implementation |
SE Queensland |
| Citytrain Safe Railway Stations |
39.454 |
Implementation |
SE Queensland |
| Citytrain Station Conduit Upgrade |
35.5 |
Implementation |
Various |
| Coal Electric Loco Fleet Upgrade Stages 1 & 2 (QR) Townsville |
181.051 |
In production |
Northern |
| Coomera to Helensvale, Kuraby to Kingston: Additional Tracks |
330 |
Construction |
SE Queensland |
| Coppabella Yard Upgrade |
32 |
Construction |
Mackay |
| Corinda to Darra third track |
189 |
Construction |
SE Queensland |
| Dalrymple Bay Coal Terminal 3rd loop |
106.544 |
Construction |
Mackay |
| Disabled Access Compliance infrastructure and rollingstock |
44 |
Implementation |
Various |
| Electrification Infrastructure renewal strategy (QR) |
25.05 |
Implementation |
SE Queensland |
| Electrification Capacity Upgrade Strategy |
18.41 |
Implementation |
SE Queensland |
| Electric Loco Upgrade Program |
141 |
In production |
Fitzroy-Wide Bay Burnett |
| Electric Multiple Unit Re-engineering and Overhaul |
81 |
In production |
SE Queensland |
| Electric Multiple Unit Overhauls Partially Completed |
30 |
In production |
SE Queensland |
| Galilee Coal project (Hancock): open cut thermal coal mine with rail and port facilities in the Galilee Basin |
7500 |
Feasibility |
Central West-Fitzroy |
| Galilee Coal project (Waratah): coal mine, railway and port facility in Central Queensland to export high volatile, low sulphur, steaming coal to international markets. Processed coal will be transported by a new 495 km rail system from the Galilee Basin to a planned export port facility on the Central Queensland coast. Waratah Coal will construct a state-of-the-art, heavy haul, standard gauge rail system to support 21,000 tonne train units. The system will be equipped with dual gauge rail from the Bowen Basin mining area to the port to accommodate third party users from the Bowen Basin region. The port will have an initial capacity of 50 million tonnes of coal per year and will accommodate a full range of bulk carriers including the new 350,000 DWT Chinamax class vessel. As the rail and port system reaches full annual export capacity of 50 Million tonnes, approximately 50 trains per week will transport coal to the port. Depending on vessel size, approximately 8 to 10 bulk carriers will enter the port weekly with a range of destinations including Japan, Korea, China, Taiwan, other Asian nations and India. Construction 2010. |
1,000 (mine)
2,000 (railway)
1,500 (port) |
Under Study |
Central West-Fitzroy |
| Gold Coast Rapid Transit System (First Stage-Parkwood to Broadbeach; Secobd Stage-extend to Coolangatta) |
1670 |
Basic Engineering |
SE Queensland |
| Hail Creek Rail Construction |
96 |
Construction |
Mackay |
| Harrow Passing Loop (Peak Downs - Saraji Passing Loop) |
15.9 |
Construction |
Mackay |
| Increased Rail Capacity inInner Brisbane: increase rail capacity in inner areas and additional stations in areas of high demand |
7300 |
Under Study |
SE Queensland |
| Jilalan Rail Yard: Upgrade of existing rail yard consisting of two new bypass roads with provision for a third, two provisioning tracks, a provisioning facility, a wagon maintenance facility, and modifications to existing yard and maintenance tracks. Expected completion 2009-10. |
500 |
Construction |
Mackay |
| Landsborough to Nambour: Track Upgrade |
800 |
Under Study |
SE Queensland |
| Metropolitan Freight Capacity Enhancements: infrastructure works Brisbane |
84.26 |
Construction |
SE Queensland |
| Mettrip Rollingstock (24 x 3-car Units) |
289 |
In production |
Wide Bay-Burnett |
| Minimum Maintenance Track - Metro |
39.402 |
Implementation |
Various |
| Mitchelton to Keperra Rail Duplication: expected completion 2008-09 |
46 |
Construction |
SE Queensland |
| Mt Isa Line concrete relay, re-rail & associated works |
63 |
Construction |
North West |
| Mount Lindesay Highway— Acacia Ridge Rail Crossing Grade Separation: expected completion 2008-09 |
110 |
Construction |
SE Queensland |
| Moura Link—Aldoga Rail Project: Construction of new rail maintenance and provisioning facilities in Aldoga. Expected start 2009 and completion mid 2012 |
500 |
Basic Engineering |
Fitzroy |
| North Coast Line Re-railing: Nambour - Parana |
11 |
Detailed Engineering |
Wide Bay-Burnett |
| Northern Minerals Province: Driver Activated Points Stage 1 |
107 |
Basic Engineering |
North West |
| Northern Missing Link Rail Line: Goonyella to Abbot Point Expansion |
440-670 |
Detailed Engineering |
Mackay |
| Project Iron Boomerang: Building a 3000 km rail link from the Western Australia Pilbara iron-ore region to the Queensland Bowen Basin coalfields, which will supply feedstock to smelter parks at each end of the rail line. |
12400 |
Feasibility |
Mackay-North West |
| QR Additional Citytrain Rollingstock |
296.837 |
In production |
Wide Bay-Burnett |
| QR MetTRIP – Additional Citytrain Rollingstock |
289.456 |
In production |
Wide Bay-Burnett |
| QR standard gauge freight wagons (20 container; 151 5 pack container wagons; 5 well wagons; 60 pairs well wagons) |
Not available |
Tendering |
SE Queensland |
| QR Future Citytrain Rollingstock |
923.1 |
Committed |
SE Queensland |
| QR Goonyella System: Rail Upgrade |
11.45 |
Basic Engineering |
Mackay |
| Regional re-railing strategy |
27.96 |
Implementation |
Various |
| Robina to Varsity Lakes Rail |
300.131 |
Detailed Engineering |
SE Queensland |
| Springfield Line: part of Darra to Springfield Transport Corridor Stage 1 |
390.28 |
Detailed Engineering |
SE Queensland |
| St Lawrence River Bridge Replacement |
17.548 |
Committed |
Mackay |
| Stanwell to Wycarbah duplication: Gracemere to Wycarbah |
71.5 |
Construction |
Fitzroy |
| Surat Basin Railway (Southern Missing Link): 207km link the towns of Wandoan and Banana to the Port of Gladstone. Railway is likely to initially consist of single track with passing loops at approximately 25km intervals that will be able to accommodate trains approximately 2.4km in length. Construction will be undertaken with multiple work fronts and require a workforce currently estimated at an average of 400-600 personnel over a duration of approximately two and a half years. |
1200 |
EIS |
Darling Downs-South West-Fitzroy |
| Telecommunications Backbone Network Strategy |
11.21 |
Implementation |
Various |
| Telecommunications Infrastructure Renewal – Metro (QR) |
18.73 |
Implementation |
SE Queensland |
| Timber Rail Bridge Replacement |
62.995 |
Construction |
Various |
| TransLink station Upgrade Program |
248.251 |
Construction |
Various |
| Turnout and crossover refurbishment (QR) |
28.5 |
Implementation |
SE Queensland |
| Varsity Lakes Station: part of a village to comprise a new train station (Varsity Lakes), bus interchange, retail shops, commercial offices, new housing, and parks and green spaces; the exact mix of which is yet to be decided |
123 |
Construction |
SE Queensland |
| Varsity Lakes to Elanora Extension: expected completion 2009-10 |
835 |
Construction |
SE Queensland |
| VPI-type Processors Replacement (Farleigh to Purono) |
10.729 |
Implementation |
Various |
| VNQ Coal Wagon Overhauls (QR) |
21.188 |
In production |
Fitzroy |
| Westwood to Wycarbah Duplication |
32 |
Construction |
Fitzroy |
| Wiggins Island balloon loop |
22 |
Construction |
Fitzroy |