| Energy project |
Estimated project value |
Stage |
Location |
| Abermain 275/110 kV Substation Establishment Completion – summer 2008-09 |
23.3 |
Construction |
SE Queensland |
| Archer Point Windfarm |
250 |
Under Study |
Far North |
| Barron Gorge Capital Works: Capital works and modifications |
7 |
Basic Engineering |
Far North |
| Belmont 110kV Substation Refurbishment |
47 |
Construction |
SE Queensland |
| Callide Power Station - CS Energy property, plant & equipment |
109.998 |
Ongoing |
Fitzroy |
| Callide Oxyfuel Project: Callide A Power Station. Aims to prove how two technologies can be combined to achieve near zero greenhouse gas emissions from coal-fired electricity generation. The demonstration project will also assess potential commercial applications of the technologies. Six partners are collaborating on the Callide Oxyfuel Project and financial support has been sourced from these organisations, along with the Australian Government's Low Emissions Technology Demonstration Fund, the Australian Coal Association's COAL21 Fund and the Queensland Government. |
206 |
Construction |
Fitzroy |
| Condamine Power Station: CSM Gas fired power station on the CSM gas seam at Berwyndale South. 100 to 160 MW |
200 |
Construction |
Darling Downs |
| Chinchilla Coal Seam Gas-Fired Power Station (the facility will be Australia's first purpose-built coal seam methane power station, using feedstock from QGC's Surat Basin operations) |
200 |
Financial Close |
Darling Downs |
| Dalrymple Bay/Hay Point Works Ergon Energy |
76 |
Construction |
Mackay |
| Darling Downs Power Station (Ergon Energy gas-fired power station in the Darling Downs region near Braemar, 40km west of Dalby) |
780 |
Construction |
Darling Downs |
| Energex distribution augmentation |
339.005 |
Ongoing |
SE Queensland |
| Energex substation program |
490.995 |
Ongoing |
SE Queensland |
| Fairview Power Project new 100 MW gas-fired power station near Injune aims to generate electricity from methane extracted from coal seams located too deep underground to be mined |
445 |
Committed |
Darling Downs-South West |
| Gaven Substation |
17 |
Detailed Engineering |
SE Queensland |
| Greenbank Static VAR Compensator |
37 |
Construction |
SE Queensland |
| IsaLink: Construction of a 1.1 km, 500 kV HVDC transmission line to connect the northwest Queensland to the grid |
900 |
Under Study |
Northern-North West |
| Kareeya Capital Works |
8 |
Basic Engineering |
Far North |
| Kogan Creek Power Station (CS Energy property, plant and equipment) |
19.192 |
Ongoing |
Darling Downs |
| Mica Creek Power Station (CS Energy property, plant and equipment improvements) |
12.447 |
Ongoing |
North West |
| Merrimac - Install Two Transformers |
20 |
Detailed Engineering |
SE Queensland |
| Moranbah and Nebo Power Stations |
800 |
Under Study |
Mackay |
| Myrtletown Substation |
19 |
Detailed Engineering |
SE Queensland |
| North Mackay – Reinforcement of Electricity Supply Completion – late 2008 |
50 |
Construction |
Mackay |
| North Rockhampton Reinforcement of Supply (Berserker) |
19 |
Basic Engineering |
Fitzroy |
| Powerlink (Tully-Innisfail transmission line) |
87.2 |
Construction |
Far North |
| Powerlink (Innisfail-Edmonton line replacement) |
94.7 |
Construction |
Far North |
| Powerlink (Ross to Yabulu South - transmission replacement) |
107 |
Construction |
Northern |
| Powerlink (Ross to Yabulu South - transmission reinforcement) |
46.5 |
Construction |
Northern |
| Powerlink (Nebo to Strathmore state 2 reinforcement) |
145.4 |
Construction |
Mackay |
| Powerlink (Broadsound Nebo reinforcement Stage 1) |
155.7 |
Construction |
Mackay |
| South Pine 110 kV Substation Refurbishment Completion – summer 2009-10 |
53 |
Construction |
SE Queensland |
| Spring Gully Power Station 80 km north-east of Roma. Delayed with construction of Darling Downs Power Station @ Braemar. |
1000 |
On hold |
Darling Downs-South West |
| Stanwell Power Station Turbine and generator upgrade |
87 |
Basic Engineering |
Fitzroy |
| Stanwell Power Station (low nox burners) |
36 |
Construction |
Fitzroy |
| Swanbank Power Station CS Energy property, plant and equipment |
59782 |
Detailed Engineering |
SE Queensland |
| Tarong Energy (Tarong Power Station - low nox burners) |
31.37 |
Construction |
Wide Bay-Burnett |
| Tarong Energy (Tarong Power Station - instrumentation & control systems upgrade) |
46.178 |
Construction |
Wide Bay-Burnett |
| Tarong Energy (Wivenhoe Power Station - control systems refit and other) |
10.327 |
Basic Engineering |
SE Queensland |
| Toowoomba Reinforcement of Supply |
37 |
Basic Engineering |
Darling Downs |
| Townsville Reinforcement of Supply |
36 |
Construction |
Northern |
| Underground Cables: Annerley-Tennyson |
10 |
Detailed Engineering |
SE Queensland |
| Underground Cables: Brendale-Albany Creek |
9 |
Detailed Engineering |
SE Queensland |
| Underground Cables: Burleigh Heads-Currumbin |
26 |
Detailed Engineering |
SE Queensland |
| Underground Cables: Crestmead-Browns Plains |
11 |
Detailed Engineering |
SE Queensland |
| Wandoan Coal—Electricity Infrastructure: expected completion Dec 2012 |
100+ |
Under Study |
Darling Downs |
| Warwick Reinforcement of Supply and substation |
49 |
Construction |
Darling Downs |
| West Darra Substation Completion – summer 2008-09 |
27.3 |
Construction |
SE Queensland |
| Woolooga SVC (Powerlink) |
39 |
Construction |
Fitzroy |
| Yeppoon Reinforcement of Supply |
16 |
Basic Engineering |
Fitzroy |
| Zerogen Clean Coal Power Station Project Stage 1: (clean coal power plant integrating coal gasification with carbon capture and storage to produce low emission baseload power). Feasibility study and geosequestration drilling program to be completed – end 2008. EIS early 2009. Construction 2010. Commissioning 2012. |
1,700-1,900 |
Under Study |
Fitzroy |