| Project |
Estimated project value |
Stage |
Location |
| 12 and 16 Cylinder Loco Overhauls - Bulk Freight |
10.54 |
In production |
SE Queensland |
| 12 and 16 Cylinder Loco Overhauls - Regional Freight |
22.457 |
In production |
SE Queensland |
| 770 VCA (106 tonne) Coal Wagons: Fabrication of 770 VCA (106 tonne) Coal Wagons. |
165 |
In production |
SE Queensland-Northern |
| 1190 New Coal Wagons (VCA 106 tonne): Fabrication of 1190 coal wagons expected completion 2009-10. |
271 |
In production |
SE Queensland |
| 275 George Street: Start – May 2007. Completion – May 2009 |
500 |
Construction |
SE Queensland |
| 32-storey ‘A’-grade commercial office tower |
|
|
|
| 400 George Street: 33-storey ‘A’ grade office development incorporating car parking for 221 cars. Completion – 2009. |
400 |
Construction |
SE Queensland |
| 480 Queen Street Trilogy Tower: Completion – November 2012 mixed-use development |
750 |
Construction |
SE Queensland |
| Abermain 275/110 kV Substation Establishment: Completion – summer 2008-09 |
23.3 |
Construction |
SE Queensland |
| Aventura – Sunshine Coast Water Park: family tourist destination featuring a major water theme park, and conference, leisure, entertainment and accommodation facilities. |
100 |
Under Study |
SE Queensland |
| Airport Link: (Airport Link website): Bowen Hills - Toombul includes two 3-lane tunnels between Bowen Hills and Kedron, two 2-lane tunnels between Kedron and Toombul. Will be developed as a PPP. Start 2008, Finish 2012. Lutwyche Kedron Sector to be built by same constructor as Northern Busway |
3400 |
Detailed Engineering |
SE Queensland |
| Albion Station Land Bridge (QR) |
11 |
Detailed Engineering |
SE Queensland |
| Am-60: commercial office building completion October 2009 |
180 |
Construction |
SE Queensland |
| Amberley Aerospace Park: Establishment of an aerospace park proposed start end 2008 |
Not Available |
Planning |
SE Queensland |
| Auditorium - Cultural Centre |
8 |
Basic Engineering |
SE Queensland |
| Australian Quarantine Inspection Service Office Building |
8 |
Detailed Engineering |
SE Queensland |
| Aviation High development |
5.113 |
Basic Engineering |
SE Queensland |
| Beenleigh to Gold Coast Rail Corridor Upgrade |
350 |
Construction |
SE Queensland |
| Beerburrum to Landsborough Track Duplication |
354 |
Construction |
SE Queensland |
| Beerwah Rail Crossing Grade Separation: expected completion June 2009 |
70 |
Construction |
SE Queensland |
| Beerwah to Maroochydore Rail Line: Construction of a new spur line |
3116 |
Under Study |
SE Queensland |
| Bellbrook Construction of homes. Total completion – 2011-12. |
100 |
Construction |
SE Queensland |
| Belmont 110kV Substation Refurbishment |
47 |
Construction |
SE Queensland |
| Bremer Business Park: Development started – late 2004, and will continue for the next 10 years |
500 |
Construction |
SE Queensland |
| Bribie Island Aquaculture Research Centre Extension |
5.098 |
Basic Engineering |
SE Queensland |
| Brighton on Broadway: Construction of 1,200 dwellings in four towers completion – March 2012 |
900 |
Construction |
SE Queensland |
| Brighton - Redcliffe Road |
315 |
Basic Engineering |
SE Queensland |
| Brisbane Airport New Parallel Runway Project |
1300 |
Detailed Engineering |
SE Queensland |
| Brisbane Domestic Terminal Precinct Expansion: including constructing a new, multi-level car park for short-term parking, making changes to the precinct's road system to improve traffic flow and security, expanding and upgrading checkin and other facilities, and undertaking significant apron expansion. |
450-600 |
Under Study |
SE Queensland |
| Brisbane Boggo Road Precinct redevelopment (Urban Village): first stage of the proposed knowledge based research and business component providing approximately 60,000 square metres of office and laboratory space for scientific research into eco-science |
45.476 |
Construction |
SE Queensland |
| Brisbane Convention Centre Expansion: The extension will front Grey St between Rydges Hotel and the South Brisbane Railway Station, and will consist of 3 levels with an additional Mezzanine Level. |
130 |
Construction |
SE Queensland |
| Brisbane Cruise Ship Terminal Expansion and residential development |
176 |
Under Study |
SE Queensland |
| Brisbane Innovation Park: to encourage the clustering of research institutes and private enterprises to connect scientific research with industry development |
5 |
Basic Engineering |
SE Queensland |
| Brisbane Joint Contract Centre Zillmere |
57.4 |
Committed |
SE Queensland |
| Brisbane Metro: Minimum Maintenance Track (Transport Service Contract II) completion 2010-11 |
51 |
Implementation |
SE Queensland |
| Brisbane Port Coal Terminal: expansion to 8Mtpa (requires timely contract Committed by Users to initiate construction) |
60 |
Likely |
SE Queensland |
| Brisbane Port Coal Terminal: expansion to 10Mtpa (requires timely contract Committed by Users to initiate construction) |
25 |
Possible |
SE Queensland |
| Brisbane State High School Stages 2A and 2B Performing Arts Centre |
9.183 |
Committed |
SE Queensland |
| Brisbane Supreme and District Court complex: expected to feature: 19 storeys; 47 courtrooms at full capacity; dedicated wings for civil and criminal trials; separate lifts and pathways for the security of judges, jurors, prisoners and members of the public; videoconferencing; closed-circuit television facilities to enable child witnesses and vulnerable witnesses and victims to give evidence in a private and secure environment; includes a large public square between the new complex and Brisbane Magistrates Court. It will also link the Tank Street pedestrian and bicycle bridge with the Roma Street Parklands. Construction is expected to start in 2009 and be completed in 2011. |
600 |
Construction |
SE Queensland |
| Brisbane Youth Detention Centre enhancements |
23.258 |
Tender Evaluation |
SE Queensland |
| Browns Plains Health Precinct |
23.1 |
Construction |
SE Queensland |
| Bruce Highway: Boundary Road to Caboolture |
411 |
Construction |
SE Queensland |
| Bruce Highway – Caboolture: Uhlmann Road - Caboolture, widen 4 to 6 lanes |
183 |
Basic Engineering |
SE Queensland |
| Bruce Highway Upgrade: Cooroy to Gympie |
3300 |
Basic Engineering |
SE Queensland- Wide Bay Burnett |
| Brisbane Urban Corridor (Griffith Arterial): staged upgrade over the next three to five years subjet to federal funding |
991 |
Committed |
SE Queensland |
| Bruce Highway: Brisbane to Gympie (Nambour) |
35 |
Detailed Engineering |
SE Queensland |
| Buderim Multiple Dwelling Units and Four-Lot Subdivision: 266 multiple dwelling units |
20+ |
Approval being processed |
SE Queensland |
| Buranda Development: residential, retail and commercial, entertainment, medical, and short-term accommodation |
550 |
Committed |
SE Queensland |
| Burleigh Connection Road: Mattocks Road to Kortum Drive improvements |
40 |
Basic Engineering |
SE Queensland |
| Burpengary Meadows State School, Stage 2: includes 3 new buildings to existing school |
3.55 |
Tender Evaluation |
SE Queensland |
| Burpengary–Caboolture Road (Morayfield Road) |
149 |
Committed |
SE Queensland |
| Caboolture District Police Headquarters |
10 |
Construction |
SE Queensland |
| Caboolture Health Precinct |
21 |
Construction |
SE Queensland |
| Caboolture to Beerburrum Rail Upgrade: Duplicate the rail line for 14 km |
298 |
Detailed Engineering |
SE Queensland |
| Caboolture to Beerburrum to Landsborough Duplication |
652 |
Detailed Engineering |
SE Queensland |
| Caboolture–Bribie Island Road |
47.5 |
Basic Engineering |
SE Queensland |
| Caloundra Downs: large masterplanned community |
Not available |
Under Study |
SE Queensland |
| Caloundra Health 30 Additional Beds |
22 |
Detailed Engineering |
SE Queensland |
| Caloundra Road Upgrade |
80 |
Construction |
SE Queensland |
| Caloundra to Maroochydore Quality Bus Corridor and Public Transport Stations (CoastConnent): “CoastConnect” expected to play a vital role in managing traffic congestion along Nicklin Way, Brisbane Road and Aerodrome Road. The CoastConnect project will be delivered in stages over several years commencing with Final Concept Design and Impact Management Plan in early 2009. |
297 |
Basic Engineering |
SE Queensland |
| Caloundra Road to Mooloolaba Road (Multi-modal Transport Corridor) |
59.8 |
Basic Engineering |
SE Queensland |
| Caloundra–Mooloolaba Road: preliminary works |
64 |
Basic Engineering |
SE Queensland |
| Caloundra–Mooloolaba Road: new 2 lane link |
75 |
Construction |
SE Queensland |
| Calypso Bay: The 30-berth first stage of the marina and waterfront completed – 2005. More development continuing over the next decade |
1000 |
Construction |
SE Queensland |
| Carseldine Police Station |
8 |
Detailed Engineering |
SE Queensland |
| Cavalry Road: 450 lot sub-division adjacent to the new Sippy Downs Town Centre |
81 |
Committed |
SE Queensland |
| Centenary Highway Bus Priority/Transit |
310 |
Basic Engineering |
SE Queensland |
| Centenary Highway Four Lanes: Ipswich Motorway to Springfield |
1170 |
Basic Engineering |
SE Queensland |
| Centenary Highway Two Lanes: Springfield to Yamanto |
366 |
Construction |
SE Queensland |
| Chancellor State College Stage 3C Performing Arts: (Sunshine Coast) |
4.811 |
Construction |
SE Queensland |
| Chancellor Village: 140 units in 4 buildings with 1500 sqm of home based business (HBO) retail, commercial and residents' recreational facilities. Completion July 2010. |
70 |
Under Study |
SE Queensland |
| Citiswich: integrated industrial estate located within the Western Corridor. |
300 |
Construction |
SE Queensland |
| Citytrain Disability Standards 2007 Compliance: Rollingstock (QR Redbank) |
48 |
Implementation |
SE Queensland |
| Citytrain Safe Railway Stations |
39.454 |
Implementation |
SE Queensland |
| Coolum Industrial Estate |
30 |
Basic Engineering |
SE Queensland |
| Coomera District Police Office |
11 |
Detailed Engineering |
SE Queensland |
| Coomera Springs State School Stage 1B |
11.219 |
Construction |
SE Queensland |
| Coomera Town Centre: Development expected to start – 2010. Proposed development of a new city commercial hub for 70,000 people on 60 ha of land, located around the Brisbane-Gold Coast Rail link (a greenfield Town Centre). |
1,000+ |
Under Study |
SE Queensland |
| Coomera to Helensvale, Kuraby to Kingston: Additional Tracks |
330 |
Construction |
SE Queensland |
| Coomera Waters: Construction started – 2001. Expected completion – 2010. |
546 |
Construction |
SE Queensland |
| Corinda to Darra third track |
189 |
Construction |
SE Queensland |
| Cupania State School: (new school) |
17.004 |
Construction |
SE Queensland |
| Cunningham Highway Four Lanes: Ripley Road to Ebenezer |
900 |
Basic Engineering |
SE Queensland |
| Cunningham Highway to Warrego Highway Connection: subject to federal funding |
127 |
Committed |
SE Queensland |
| Custom: 20 modern terrace homes, 54 one, two and three bedroom apartments, and a 1,000 m2 retail and commercial precinct |
54 |
Construction |
SE Queensland |
| D’Aguilar Highway |
6.3 |
Basic Engineering |
SE Queensland |
| Department of Housing construction medium density Brisbane |
60.203 |
Committed |
SE Queensland |
| Department of Housing construction medium density Gold Coast |
5.571 |
Committed |
SE Queensland |
| Department of Housing construction medium density Sunshine Coast |
4.597 |
Committed |
SE Queensland |
| Disability Services Queensland tailored accommodation Hillcrest |
14.012 |
Construction |
SE Queensland |
| Dolphin Tower 1 & 2 (Dolphin Arcade Redevelopment): Dolphin Tower 1 – 34-storeys, and Tower 2 – 57 storeys |
700 |
Under Study |
SE Queensland |
| Domestic Terminal Redevelopment Project |
140 |
Detailed Engineering |
SE Queensland |
| Earnshaw State College (Indoor Sports Facility) |
4.744 |
Basic Engineering |
SE Queensland |
| Eastern Busway: Buranda – Coorparoo: next stage to be constructed will be the South East Busway, Buranda to Main Avenue, Coorparoo section. Construction of this section is due to start in mid 2009 for completion by early 2012 |
465.749 |
Basic Engineering |
SE Queensland |
| Eastern Busway (Boggo Road Busway): Eleanor Schonell Bridge to Princess Alexandra Hospital: This is Stage 1 of the Eastern Busway, linking Eleanor Schonell Bridge at Dutton Park and University of Queensland to PA Hospital at Buranda, and integrated with the Boggo Road redevelopment, including tunnels and two bus stations |
226 |
Committed |
SE Queensland |
| Eastern Busway: Princess Alexandra Hospital to Buranda: this section of the busway will link the South East Busway to the new Boggo Road Busway at the Princess Alexandra Hospital, allowing travellers to reach the hospital, Park Road station and the University of Queensland |
137.8 |
Basic Engineering |
SE Queensland |
| Eastern Pipeline Inter-Connector: a bulk water network that will transport water between Redland Shire and Logan City. The pipeline will be capable of distributing water in either direction. |
38 |
Construction |
SE Queensland |
| East–West Links: Glass House Mountains Road start 2008-09 |
106 |
Detailed Engineering |
SE Queensland |
| Ebenezer Industrial Precinct |
11 |
Basic Engineering |
SE Queensland |
| Ecosciences Precinct and Health & Food Precinct |
290 |
Construction |
SE Queensland |
| Electrification Infrastructure renewal strategy (QR) |
25.05 |
Implementation |
SE Queensland |
| Electrification Capacity Upgrade Strategy |
18.41 |
Implementation |
SE Queensland |
| Electric Multiple Unit Re-engineering and Overhaul |
81 |
In production |
SE Queensland |
| Electric Multiple Unit Overhauls Partially Completed |
30 |
In production |
SE Queensland |
| Energex Corporate Office: completion 2010 |
163 |
Construction |
SE Queensland |
| Energex distribution augmentation |
339.005 |
Ongoing |
SE Queensland |
| Energex substation program |
490.995 |
Ongoing |
SE Queensland |
| Everton Park Urban Village: 3 stages, Stage 1 retail-commercial start March 2009 |
400 |
Committed |
SE Queensland |
| Fairways at Brookwater: multi-staged development of highquality, architecturally designed residences close to Brookwater Golf Club |
125 |
Construction |
SE Queensland |
| Fernbrooke: Master-planned residential community - 1000 detached residential homesites. |
100+ |
Construction |
SE Queensland |
| Forest Pines: Masterplanned residential community |
40+ |
Committed |
SE Queensland |
| Gainsborough Greens: residential community of 6000 residents in 2300 dwellings: Feb 2008-2016 |
950 |
Construction |
SE Queensland |
| Gasworks: Newstead residential, retail and commercial April 2008-May 2018 |
458 |
Committed |
SE Queensland |
| Gateway Upgrade Project |
1833 |
Construction |
SE Queensland |
| Gaven Substation |
17 |
Detailed Engineering |
SE Queensland |
| General Purpose Berth - Fisherman Islands |
46 |
Basic Engineering |
SE Queensland |
| Gold Coast Convention Centre - Stage 2 Extension |
40 |
Basic Engineering |
SE Queensland |
| Gold Coast Desalination Plant |
1209 |
Construction |
SE Queensland |
| Gold Coast Institute of TAFE - Coomera Education Precinct: completion Sept 2009 |
31.7 |
Construction |
SE Queensland |
| Gold Coast Long-Term Accommodation Project Start – 2011. Completion – 2012 facilities to accommodate Council’s administrative, customer service, civic and cultural functions in the most effective manner in the longer term. |
255 |
Under Study |
SE Queensland |
| Gold Coast Marine Development Project: elements of the project under consideration with preferred developer to be announced Feb 2009 |
300+ |
Committed |
SE Queensland |
| Gold Coast International Marine Precinct: marine industry facility adjacent to existing Gold Coast marine precinct |
530 |
Under Study |
SE Queensland |
| Gold Coast Rapid Transit System (First Stage-Parkwood to Broadbeach; Secobd Stage-extend to Coolangatta) |
1670 |
Basic Engineering |
SE Queensland |
| Gold Coast University Hospital: New hospital at Parklands near Southport next to the Griffith University Campus. Operating by end 2012. |
1549 |
Tendering |
SE Queensland |
| Goodna Wastewater Centre Augmentation: Project completion – 2012 |
80 |
Construction |
SE Queensland |
| Greenbank Static VAR Compensator |
37 |
Construction |
SE Queensland |
| Greenbank State School (GLAB - 2 storey - 8 spaces) |
2.7 |
Basic Engineering |
SE Queensland |
| Hale Street Bridge |
241 |
Construction |
SE Queensland |
| Health City Stage 1 Springfield |
200 |
Construction |
SE Queensland |
| Hinze Dam Raising ( Stage 3) Completion December 2010 |
395 |
Construction |
SE Queensland |
| Hope Island Road |
109 |
Basic Engineering |
SE Queensland |
| Hope Island Road 2 |
31 |
Basic Engineering |
SE Queensland |
| Hope Island Resort: Development of medium density residences now underway. Project completion – 2009 |
135 |
Construction |
SE Queensland |
| Hope Vale Primary Health Care Centre |
10 |
Tendering |
SE Queensland |
| Horizon Shores Marina expansion: redevelopment will feature a luxurious resort village surrounding the marina |
500 |
Construction |
SE Queensland |
| Hotel Gloria: Construction – 2009 |
50 |
Committed |
SE Queensland |
| Houghton Highway: bridge and approaches |
315 |
Construction |
SE Queensland |
| ICT Modernisation - TAFE |
7 |
Basic Engineering |
SE Queensland |
| i-METT: master-planned development - motorsport, education, tourism and technology precinct |
650 |
Under Study |
SE Queensland |
| Increased Rail Capacity inInner Brisbane: increase rail capacity in inner areas and additional stations in areas of high demand |
7300 |
Under Study |
SE Queensland |
| Institute for Glycomics Stage 2: Completion – end of 2008 expanding the Institute |
35 |
Committed |
SE Queensland |
| International Terminal Building |
19 |
Detailed Engineering |
SE Queensland |
| International Terminal Building 2 |
24 |
Detailed Engineering |
SE Queensland |
| Insignia Towers Completion – 2009 |
Not available |
Construction |
SE Queensland |
| Ipswich Courthouse |
91.51 |
Construction |
SE Queensland |
| Ipswich Hospital redevelopment expected completion 2026 |
270 |
Planning |
SE Queensland |
| Ipswich Motorway - Goodna Bypass |
2300 |
Basic Engineering |
SE Queensland |
| Ipswich Motorway - Logan Motorway Interchange |
255 |
Construction |
SE Queensland |
| Ipswich Motorway Upgrade: Wacol to Darra |
320 |
Construction |
SE Queensland |
| Ipswich Multifunction Project: proposed transit centre, offices, health and residential facililties |
1,000+ |
Under Study |
SE Queensland |
| Ithica Creek State School (GLAB - 3 storey - 8 spaces - open under) |
4.05 |
Committed |
SE Queensland |
| Kelvin Grove Urban Village: university campus integrated with surrounding retail, commercial and residential development. Various projects to 2010-11. |
1000 |
Construction |
SE Queensland |
| Kenmore State High School (stage 1 redevelopment) |
8.8 |
Detailed Engineering |
SE Queensland |
| Landsborough to Nambour: Track Upgrade |
800 |
Under Study |
SE Queensland |
| Lockyer District State High School |
6 |
Basic Engineering |
SE Queensland |
| Logan Motorway Upgrade: Ipswich Motorway to Gateway Motorway |
3600 |
Basic Engineering |
SE Queensland |
| Mango Hill (Northlakes) Police Station |
6 |
Detailed Engineering |
SE Queensland |
| Marina Quays Completion – 2014 |
1500 |
|
SE Queensland |
| Mariners Cove Broadwater Harbour Development |
400 |
Under review |
SE Queensland |
| Maroochydore - New Office Building |
84.5 |
Basic Engineering |
SE Queensland |
| Meridan State College (Stage 2A Sunshine Coast) |
3.64 |
Committed |
SE Queensland |
| Metro: high-density, mixed-use commercial, residential and retail development on Sunshine Coast – DA Feb 2009. |
200 |
Under Study |
SE Queensland |
| Metropolitan Freight Capacity Enhancements: infrastructure works Brisbane |
84.26 |
Construction |
SE Queensland |
| Metropolitan South Institute of TAFE Loganlea campus |
5.986 |
Committed |
SE Queensland |
| Mitchelton Special School redevelopment |
5.49 |
Committed |
SE Queensland |
| Metropolitan South Institute of TAFE Mt Gravatt (redevelopment stage I) |
20.33 |
Detailed Engineering |
SE Queensland |
| Metropolitan South Institute of TAFE Mt Gravatt (Stage II) |
12.178 |
Detailed Engineering |
SE Queensland |
| Mitchelton to Keperra Rail Duplication: expected completion 2008-09 |
46 |
Construction |
SE Queensland |
| Merrimac East Project third phase of the Beenleigh-Merrimac-Pimpama wastewater upgrade |
128 |
Construction |
SE Queensland |
| Merrimac - Install Two Transformers |
20 |
Detailed Engineering |
SE Queensland |
| Motorline City Precinct project will take approximately five years to complete from start date construction of 12 new buildings including office and apartment buildings up to 25 storeys – 2008-16 |
400 |
Under Study |
SE Queensland |
| Mount Cotton State School (GLAB - 2 storey - 8 spaces) |
2.562 |
Committed |
SE Queensland |
| Mount Lindesay Arterial |
113.2 |
Basic Engineering |
SE Queensland |
| Mount Lindesay Highway |
90 |
Basic Engineering |
SE Queensland |
| Mount Lindesay Highway— Acacia Ridge Rail Crossing Grade Separation: expected completion 2008-09 |
110 |
Construction |
SE Queensland |
| Mudgeeraba Substation |
9 |
Detailed Engineering |
SE Queensland |
| Murrumba Downs Water Pollution Control Works Alliance $52.7M (treatment plant upgrade –$41M. Advanced water factory – $11.7M) |
105.4 |
Construction |
SE Queensland |
| Myrtletown Substation |
19 |
Detailed Engineering |
SE Queensland |
| Nambour Residential Aged Care Facility |
13.759 |
Tendering |
SE Queensland |
| Narangba Industrial Estate |
6 |
Basic Engineering |
SE Queensland |
| New England Highway |
27 |
Basic Engineering |
SE Queensland |
| Newstead Riverpark retail and commercial precinct, comprising four buildings and around 440 apartments located in seven buildings |
300 |
Under Study |
SE Queensland |
| Noosa Civic, Stage 3: Retail and commercial development |
310 |
Committed |
SE Queensland |
| North Bridge A 32-storey ‘A’ Grade commercial office building incorporating |
350 |
Construction |
SE Queensland |
| Northeast Business Park Project: residential, commercial and light industrial purposes, including a marina, golf course |
630 |
Under Study |
SE Queensland |
| Northern Busway: Herston (linking with the Inner Northern Busway) to Bracken Ridge via Windsor, Lutwyche, Kedron, Chermside & Aspley. Will be delivered as a PPP. Start 2008, First Stage (to Lutwyche/Kedron) due for completion 2010. Lutwyche - KEdron sector to be built by same constructors as Airport Link |
777 |
Construction |
SE Queensland |
| Northern Link—Toowong to Kelvin Grove: proposed underground, twin, two-lane toll road between the Western Freeway in Toowong and the Inner City Bypass at Kelvin Grove |
1800 |
EIS |
SE Queensland |
| Northern Pipeline Inter-Connector: Stages 1 and 2 will connect dams, weirs and other water storages to move surplus water between Caboolture and the Sunshine Coast. With the potential capacity to transport 65 million litres of potable water per day, the pipeline will link existing and potential future water sources throughout the Sunshine Coast. Stage 1 expected completion Dec 2008. Stage 2 expected start mid 2009. |
849 |
Basic Engineering |
SE Queensland |
| North Lakes Development of a new master planned community Expected completion – 2012 |
2,200+ |
Construction |
SE Queensland |
| North Lakes Health Precinct: purpose built clinical areas and consultation rooms, multi service rooms, education areas, therapy and rehabilitation areas, purpose built pregnancy and early years areas |
52 |
Construction |
SE Queensland |
| North Shore 270 Ocean Drive, Mudjimba. Villas and residential houses |
30 |
Under Study |
SE Queensland |
| Northshore Hamilton Development urban renewal project Started – mid-2006. Completion – 2011-12 |
2,000+ |
Construction |
SE Queensland |
| North-South Bypass Tunnel (Clem Jones Tunnel): two parallel tunnels (one for northbound traffic and one for southbound traffic) about 5 km in length. The tunnels run under the Brisbane River and to link to the Inner City Bypass and Lutwyche Road at Bowen Hills in the north, and with the Pacific Motorway and Ipswich Road at Woolloongabba in the south. |
3400 |
Construction |
SE Queensland |
| Northern Busway: Herston (linking with the Inner Northern Busway) to Bracken Ridge via Windsor, Lutwyche, Kedron, Chermside & Aspley. Will be delivered as a PPP. Start 2008, First Stage (to Lutwyche/Kedron) due for completion 2010. Lutwyche - KEdron sector to be built by same constructors as Airport Link |
777 |
Tendering |
SE Queensland |
| Northern Coomera State School |
10 |
Basic Engineering |
SE Queensland |
| Northshore Hamilton Development urban renewal project Started – mid-2006. Completion – 2011-12 |
2,000+ |
Construction |
SE Queensland |
| Nundah Community Health Centre |
15 |
Construction |
SE Queensland |
| Nundah Offices Main Roads |
49.2 |
Basic Engineering |
SE Queensland |
| Orion Shopping Centre (Stage 2) four-stage project within the Greater Springfield Gateway CBD |
103.3 |
Construction |
SE Queensland |
| Ormeau Shopping Centre Stage 1 |
46.3 |
Construction |
SE Queensland |
| Ormeau State High School new school |
24.273 |
Committed |
SE Queensland |
| Outer Northern Brisbane new school |
18.444 |
Committed |
SE Queensland |
| Pacific Motorway (Coomera): Construction of an interchange on the Pacific Motorway at Coomera |
160 |
Planning |
SE Queensland |
| Pacific Highway (Mudgeeraba) |
60 |
Detailed Engineering |
SE Queensland |
| Pacific Motorway (Nerang to Stewart Road): Six-lane upgrade and interchange upgrades on the Pacific Motorway south of Nerang to Stewart Road at Tugun |
600 |
Planning |
SE Queensland |
| Pacific Motorway (Rochedale to Loganlea): Eight-lane upgrade of the Pacific Motorway between the Gateway Motorway at Rochedale and the Logan Motorway at Loganlea, including interchange upgrade at Loganlea Road |
492.9 |
Planning |
SE Queensland |
| Palmview: master-planned residential development - 7000 new homes expected start 2011 |
750 |
Committed |
SE Queensland |
| Paradise Point Waterfront Community and Marina Project Master plan approved. Stage 1 470 dwellings near the prestige Sovereign and Ephraim islands |
270 |
Under application |
SE Queensland |
| Peregian Master-Planned Community |
20+ |
Under Study |
SE Queensland |
| Petrie Terrace Old Police Barracks Redevelopment Started – February 2007. Completion – September 2008 |
120 |
Construction |
SE Queensland |
| Petrie to Redcliffe Multi-modal Corridor: public transport corridor (2020-21 start) |
550 |
Planning |
SE Queensland |
| Pine Rivers Courthouse |
10.8 |
Construction |
SE Queensland |
| Pinkenba Ethanol Bio-Refinery: dry milling ethanol bio-refinery on an existing industrial site in Brisbane. At full production, the bio-refinery will process up to approximately 400,000 t/a of grain feedstock to produce approximately 160 ML of fuel grade ethanol, fertiliser, aqueous ammonia and electricity. |
150 |
Basic Engineering |
SE Queensland |
| Polaris Data Centre six-storey world-class data centre Operational – end of 2008 |
121 |
Construction |
SE Queensland |
| Police Academy Project 2012: new academy complex |
450 |
Construction |
SE Queensland |
| Police Stations: |
|
Committed |
SE Queensland |
| · Camp Hill replacement station |
2.501 |
|
|
| · Carseldine new station |
8.4 |
|
|
| · Coomera new district office |
11.2 |
|
|
| · Crestmead new station |
5.4 |
|
|
| · Fortitude Valley new station |
13.2 |
|
|
| · Holland Park replacement station |
7 |
|
|
| · Ipswich replacement station |
18.979 |
|
|
| · Mango Hill new station |
5.36 |
|
|
| · Reedy Creek new station |
3.8 |
|
|
| · Sippy Downs new station |
5.502 |
|
|
| · Springfield new station |
5.4 |
|
|
| · Surfers Paradise new station |
3.535 |
|
|
| · Upper Mt Gravatt station refurb |
3.577 |
|
|
| Port of Brisbane Motorway: Stage 2 |
1300 |
Preliminary Design |
SE Queensland |
| Port of Brisbane Wharf & Berth 11 & 12: Berth 11 expected to be operational by 2012 and Berth 12 in 2014. |
342.5 |
Basic Engineering |
SE Queensland |
| Princess Alexandra Hospital Additional Bed Capacity including upgrade of the Emergency Department |
52 |
Detailed Engineering |
SE Queensland |
| Queen Elizabeth II Hospital Elective Surgery Upgrade: An expansion of the elective surgery facility at QEII; A 30 bed surgical ward to be used mainly for the treatment of elective orthopaedic patients; One additional operating theatre to support the opening of these new inpatient beds; An expansion of the Central Sterilising Services Department; Additional facilities for allied health rehabilitation services and specialist outpatient clinics. |
35 |
Tendering |
SE Queensland |
| Queensland Ambulance Ipswich replacement station |
3.965 |
Basic Engineering |
SE Queensland |
| Queensland Academy for Health Sciences |
31 |
Basic Engineering |
SE Queensland |
| Queensland Bulk Water Supply Authority (raising of the Hinze Dam stage 3) |
395 |
Detailed Engineering |
SE Queensland |
| Queensland Children's Hospital |
1044 |
Basic Engineering |
SE Queensland |
| Queensland Combined Emergency Services Academy strategic development project |
20 |
Committed |
SE Queensland |
| Queensland Emergency Operations Centre Brisbane |
76.05 |
Committed |
SE Queensland |
| Queensland Fire and Rescue Burpengary (new station) |
3.254 |
Tendering |
SE Queensland |
| Queensland Fire and Rescue Kippa Ring (replacement station) |
3.134 |
Tendering |
SE Queensland |
| Queensland Fire and Rescue Nambour (replacement station) |
3.65 |
Detailed Engineering |
SE Queensland |
| Queensland Fire and Rescue Nerang (new station) |
3.75 |
Committed |
SE Queensland |
| Queensland Fire and Rescue Pullenvale (replacement station) |
3.4 |
Committed |
SE Queensland |
| Queensland Fire and Rescue Redland Bay (new station) |
3.2 |
Detailed Engineering |
SE Queensland |
| Queensland Fire and Rescue Southport (station redevelopment) |
3.002 |
Committed |
SE Queensland |
| Queensland Fire and Rescue Woodridge (replacement station) |
3.75 |
Committed |
SE Queensland |
| Queensland Performing Arts Centre Redevelopment: Persons with disability access work to Lyric Theatre and The Concert Hall and associated work. In-theatre work for both the Lyric Theatre and Concert Hall which includes such work as acoustic enhancement, services etc. Back of house refurbishment. Key maintenance including roof leaks. Other: New stage door, courtyard cafe, covered vehicle drop-off in Grey Street |
34 |
Construction |
SE Queensland |
| QR Albion Station Land Bridge |
11 |
Detailed Engineering |
SE Queensland |
| QR standard gauge freight wagons (20 container; 151 5 pack container wagons; 5 well wagons; 60 pairs well wagons) |
Not available |
Tendering |
SE Queensland |
| QR Future Citytrain Rollingstock |
923.1 |
Committed |
SE Queensland |
| Raptis Plaza Apartments A & B – 27 and 29 storeys respectively |
Not available |
Under Study |
SE Queensland |
| Redcliffe Hospital Emergency Dept upgrade |
27.515 |
Construction |
SE Queensland |
| Redland Bay Road Upgrade: Start 2010 |
73 |
Committed |
SE Queensland |
| Redland Subarterial: Start Nov 2009 |
37.7 |
Committed |
SE Queensland |
| Replacement of Emergency Management Queensland Helicopter Rescue Fleet |
48.739 |
Basic Engineering |
SE Queensland |
| Ripley Valley Residential Development Construction start – 2010. Includes town centre, commercial, residential, recreational and industrial zones |
Not available |
Committed |
SE Queensland |
| Riverpoint Apartments: 300 residential apartments. |
300 |
Committed |
SE Queensland |
| Robina Health Precinct |
27 |
Construction |
SE Queensland |
| Robina Hospital Expansion |
240 |
Detailed Engineering |
SE Queensland |
| Robina to Varsity Lakes Rail |
300.131 |
Detailed Engineering |
SE Queensland |
| Settlers Cove Completion of remaining apartments (142 in total) – end of 2011 |
200 |
Construction |
SE Queensland |
| Sippy Downs Police Station |
6 |
Basic Engineering |
SE Queensland |
| Sir David Longland Correctional Centre redevelopment |
110 |
Construction |
SE Queensland |
| SkillsTech Australia - Acacia Ridge (Stage I & II) |
100.456 |
Committed |
SE Queensland |
| SkillsTech Australia - Northern Brisbane Eagle Farm Campus |
48 |
Basic Engineering |
SE Queensland |
| Smart State Medical Research Centre Completion expected – 2011-2012 |
105-155 |
Construction |
SE Queensland |
| Smart Therapies Institute (Translational Research Institute) Completion expected – 2011-2012 |
290-362 |
Construction |
SE Queensland |
| Smith Street Connection Road |
68 |
Basic Engineering |
SE Queensland |
| Soul Tower Started – April-May 2007. Completion – 2010 |
850 |
Construction |
SE Queensland |
| South East Correctional Centre at Gatton (Stage 1) Gatton Correctional Precinct Development: 300 bed women's and 1004 bed men's prison to be commissioned early in 2011. |
485.073 |
Construction |
SE Queensland |
| Southern Outlook |
4.943 |
|
SE Queensland |
| South East Busway Extension: Eight Mile Plains to Springwood |
365 |
Committed |
SE Queensland |
| South Pine 110 kV Substation Refurbishment Completion – summer 2009-10 |
53 |
Construction |
SE Queensland |
| Southport–Nerang Road: start 2009 |
85 |
Basic Engineering |
SE Queensland |
| South West Arterial: Construction of a two-lane sealed standard, between Springfield and Yamanto. |
366 |
Construction |
SE Queensland |
| Springfield Line: part of Darra to Springfield Transport Corridor Stage 1 |
390.28 |
Detailed Engineering |
SE Queensland |
| Springfield Police Station |
5 |
Basic Engineering |
SE Queensland |
| Stockland Eagle Street Pier Construction – after 2008 |
300 |
Under Study |
SE Queensland |
| Stretton State College secondary stage 2 |
12.115 |
Tendering |
SE Queensland |
| Sunshine Coast Bus/High Occupancy Vehicles Priority Program: start 2010-11 |
42 |
Committed |
SE Queensland |
| Sunshine Coast Health Precinct |
15 |
Detailed Engineering |
SE Queensland |
| Sunshine Coast Hospital - Nambour |
1210 |
Detailed Engineering |
SE Queensland |
| Sunshine Coast Institute of TAFE - Moolooaba |
4.285 |
Basic Engineering |
SE Queensland |
| Sunshine Coast Institute of TAFE - Nambour Trades |
10.696 |
Detailed Engineering |
SE Queensland |
| Sunshine Cove Precinct 1: mixed-use start 2008 |
147 |
Committed |
SE Queensland |
| Sunshine Cove Precinct 4: mixed-use Maroochydore 2009-2014 |
350 |
Under Study |
SE Queensland |
| Sunshine Cove Precinct 5: 80 residential units 2011-2012 |
51 |
Under Study |
SE Queensland |
| Sunshine Cove Precinct 7: 230 residential site area 2011-2017 |
119 |
Under Study |
SE Queensland |
| Sunshine Motorway Upgrade - Maroochydore Road to Pacific Paradise |
235 |
Construction |
SE Queensland |
| Sunshine Motorway - Pacific Paradise interchange |
85 |
Basic Engineering |
SE Queensland |
| Sunshine Motorway Extension: Mooloolah River to Kawana Way |
140 |
Committed |
SE Queensland |
| Sunshine Motorway: Mooloolaba to Peregian |
85 |
Construction |
SE Queensland |
| Sunshine Motorway: Mooloolaba to Peregian (Maroochydore to Pacific Paradise) |
104 |
Construction |
SE Queensland |
| Sunshine Motorway: Tanawha to Mooloolaba |
66 |
Construction |
SE Queensland |
| Supreme Court and District Court Complex |
600 |
Committed |
SE Queensland |
| Swanbank Power Station CS Energy property, plant and equipment) |
59782 |
Detailed Engineering |
SE Queensland |
| Tank St Pedestrian & Cycle Bridge |
63 |
Construction |
SE Queensland |
| Tarong Energy (Wivenhoe Power Station - control systems refit and other) |
10.327 |
Basic Engineering |
SE Queensland |
| The Mill (Albion): village-style development |
300 |
Construction |
SE Queensland |
| The Bremer Institute of TAFE - Bundamba campus Phase II |
16 |
Committed |
SE Queensland |
| The Glades Residences Development of a 110 ha site surrounding a Greg Norman-designed golf course, owned by Edwin Yu. |
500 |
Construction |
SE Queensland |
| The Prince Charles Hospital Upgrade |
135.2 |
Construction |
SE Queensland |
| Telecommunications Infrastructure Renewal – Metro (QR) |
18.73 |
Implementation |
SE Queensland |
| Tennyson Riverside Development: The new State Tennis Centre at Tennyson, Brisbane, will feature an international-standard roofed centre court with 5500 permanent seats and associated corporate facilities. It will also have two show courts seating 1500 spectators and 20 match and training courts. The development will include administrative and commercial facilities, including Tennis Queensland's new headquarters, a pro shop, cafe, change rooms and function rooms. This will be complemented by Mirvac's associated development which includes more than 390 residential apartments, a gymnasium and parkland that will provide public access to a scenic stretch of the Brisbane River. Tennis Centre is $82m due for completion Dec 2008. |
540 |
Construction |
SE Queensland |
| Toowoomba Pipeline: The proposed 38 km pipeline will run from the Wivenhoe Dam intake point at Paddy Gully Road and continue west past the township of Esk, through the Deowongar State Forest to Cressbrook Dam. The project is required to be completed by late January 2010. Constructiioin start Feb 2009. |
187 |
Detailed Engineering |
Darling Downs-SE Queensland |
| Trade & Technical Skills Institute |
135 |
Tendering |
SE Queensland |
| Turnout and crossover refurbishment (QR) |
28.5 |
Implementation |
SE Queensland |
| Union Milton: transit-oriented and mixed-use development |
244 |
Committed |
SE Queensland |
| Underground Cables: Annerley-Tennyson |
10 |
Detailed Engineering |
SE Queensland |
| Underground Cables: Brendale-Albany Creek |
9 |
Detailed Engineering |
SE Queensland |
| Underground Cables: Burleigh Heads-Currumbin |
26 |
Detailed Engineering |
SE Queensland |
| Underground Cables: Crestmead-Browns Plains |
11 |
Detailed Engineering |
SE Queensland |
| Varsity Lakes Complex Started – 1999. Completion – 2010 Development of a high-tech community |
1000 |
Construction |
SE Queensland |
| Varsity Lakes to Elanora Extension: expected completion 2009-10 |
835 |
Construction |
SE Queensland |
| Varsity Lakes Station: part of a village to comprise a new train station (Varsity Lakes), bus interchange, retail shops, commercial offices, new housing, and parks and green spaces; the exact mix of which is yet to be decided |
123 |
Construction |
SE Queensland |
| Viridian Resort & Spa (Stage 3) Completion – late 2009-early 2010 resort village with 192 villas and apartments located in 11 separate buildings onsite, centred around the 5-star resort and conference facilities |
300 |
Construction |
SE Queensland |
| Vision Completion – 2010 mixed-use development of offices, retail and apartments |
900 |
Construction |
SE Queensland |
| Warrego Highway–Brisbane Valley Interchange |
254 |
Basic Engineering |
SE Queensland |
| Waterfront Newstead: Residential retail and parkland precinct. |
775 |
Construction |
SE Queensland |
| West Darra Substation: Completion – summer 2008-09 |
27.3 |
Construction |
SE Queensland |
| Western Corridor Recycled Water Pipeline: 89% of pipeline and facilities complete; 91% of advanced water treatment plants complete @ 14 Oct 2008. |
2493 |
Construction |
SE Queensland |
| Western Oxenford State School (new school) |
22.751 |
Basic Engineering |
SE Queensland |
| Weyba Downs Retirement Village & Residential Care Facility: Proposed retirement village and residential care facility |
20+ |
Under Study |
SE Queensland |
|