| Project |
Estimated project value |
Stage |
Location |
| Cloncurry Copper Project (Exco): supports a strategy of consolidation of smaller tonnages of higher grade (+1.5% copper ore) through a central processing at Great Australia with estimated costs for a 600,000 t/a plant at nearly $42M. |
209 |
Under Study |
North West |
| Cloncurry Copper Project (Ivanhoe): The company’s near-term development plans include moving to a scoping study at the substantial Mount Elliot project in 2009, after an updated resource is completed. Mount Elliot could potentially host an open pit and underground operation, with Ivanhoe flagging its potential as a sub-level and black-caving operation. |
Not available |
Under Study |
North West |
| Department of Housing construction medium density North West |
3.069 |
Committed |
North west |
| Dept Mines and Energy Drill Core Facility |
4.788 |
Committed |
North West |
| Dugald River Zinc, Lead and Silver Project: Dugald River has the potential to produce about 200,000 t/a of zinc (about half the Century production of zinc), 40,000 t/a of lead and 1.5 million oz/a of silver in concentrate for at least 16 years, with a potential production start date of 2010. |
500- |
Feasibility |
North West |
| Flinders Highway Upgrade: Jardine Valley (214.0-226.1km), Charters Towers-Hughenden, rehabilitate and widen |
8.801 |
Basic Engineering |
North West-Northern |
| Handlebar Hill: opencut zinc/lead mine project |
79 |
Construction |
North West |
| Indigenous Community Housing |
10.637 |
Committed |
North West |
| IsaLink: Construction of a 1.1 km, 500 kV HVDC transmission line to connect the northwest Queensland to the grid |
900 |
Under Study |
Northern-North West |
| Kalman: copper-molybdenum-rhenium-gold deposit |
Not Available |
Under Study |
North West |
| Lady Annie Cathode Copper Mine: new mine based on a plant, mine and camp at Mount Clark |
86 |
Construction |
North West |
| Lady Loretta Zinc, Lead and Silver Project: production of around 125,000 t/a of zinc in concentrate and 40,000 t/a of lead in concentrate for more than 10 years. |
200 |
Under Study |
North West |
| Mica Creek Power Station (CS Energy property, plant and equipment improvements) |
12.447 |
Ongoing |
North West |
| Mt Isa Health Campus Redevelopment expected completion 2011-12 |
65.19 |
Detailed Engineering |
North West |
| Mt Isa Water Board (Terminal reservoir Pump Station upgrade) |
16.7 |
Construction |
North West |
| Mt Isa Water Board (Lake Moondarra pipeline Stages 1, 1A & 2) |
3.667 |
Construction |
North West |
| Mt Isa Line concrete relay, re-rail & associated works |
63 |
Construction |
North West |
| Northern Minerals Province: Driver Activated Points Stage 1 |
107 |
Basic Engineering |
North West |
| Project Iron Boomerang: Building a 3000 km rail link from the Western Australia Pilbara iron-ore region to the Queensland Bowen Basin coalfields, which will supply feedstock to smelter parks at each end of the rail line. |
12400 |
Feasibility |
Mackay-North West |
| Rocklands Copper Project: new open-cut copper mine with options to process ore on-site, crush and screen the ROM ore on-site and/or transport the ore by conveyor, truck or rail to a third party for processing, or crush and grind the ROM ore and transport the ore as a slurry via a pipeline to a third party for processing. |
Not available |
Under Study |
North West |
| Roseby Copper Project: The project comprises a number of oxidised stratabound native copper deposits separate from hydrothermal copper-gold sulphide deposits. A final feasibility study concluded that the project is viable. Key points of the first stage are the likelihood of a 5 to 8 Mt/a operation with at least an eight to nine year mine life. The anticipated production is 35,000 t/a copper and from 14,700 ounces gold per year. Mining will initially focus on the Little Eva sulphide deposit and the Blackard and Scanlon oxide deposits. It is understood that the mill will be designed to treat 8 Mt/a of soft stratabound ore but only 5 Mt/a of hard sulphide ore if not blended. |
196 |
Basic Engineering |
North West |
| Spinifex State College |
3.529 |
Construction |
North West |
| White Range Copper Project: production of 15,000 t/a of cathode copper and a mine life of about seven years |
75 |
Under Study |
North West |
| Wills Development Road: Gregory - Doomadgee turnoff, pave and seal |
7.5 |
Basic Engineering |
North West |
| Woolgar Gold Project: heap leach style development of the deposit |
Not available |
Under Study |
North West |