| Project |
Estimated project value |
Stage |
Location |
| 770 VCA (106 tonne) Coal Wagons: Fabrication of 770 VCA (106 tonne) Coal Wagons. |
165 |
In production |
SE Queensland-Northern |
| Aitkenvale Business Park: Stage 1 office building – Oct 2008-July 2009 |
42 |
Committed |
Northern |
| Ayr Police Station (replacement station & watchhouse) |
9.253 |
Construction |
Northern |
| Barrier Reef Institute of TAFE - Townsville |
15 |
Committed |
Northern |
| Bohle Industrial Estate Stage 4 - Townsville |
7 |
Basic Engineering |
Northern |
| Bruce Highway: Ingham to Innisfail |
172 |
Construction |
Far North-Northern |
| Bruce Highway - Townsville Ring Road Stages 2 and 3, Upper Ross River Road - Shaw Road, construct to new sealed 2 lane standard |
119 |
Construction |
Northern |
| Bruce Highway: Townsville to Ingham (Woodlands Shopping Centre—Veales Road) |
50 |
Construction |
Northern |
| Burdekin - three Staged Ethanol Project CSR |
100 |
Feasibility |
Northern |
| Central (formerly North Yards) The 5.8 ha site is to be developed for mixed use, and is part of the 36 ha former Townsville railway land. The new development will introduce up to 620 new units to the CBD |
300 |
Construction |
Northern |
| Cleveland Youth Detention Centre - enhancements |
14.676 |
Committed |
Northern |
| Conjuboy Diatomite Project: mining the largest known diatomite resource in Queensland which does not require calcining to achieve optimum filtration properties and mining lease application at Greenvale proposed for a processing plant |
23 |
Under Study |
Northern |
| Department of Housing construction medium density Northern |
9.82 |
Committed |
Northern |
| Flinders Highway Upgrade: Jardine Valley (214.0-226.1km), Charters Towers-Hughenden, rehabilitate and widen |
8.801 |
Basic Engineering |
Northern – North West |
| Flinders Mall Redevelopment |
50 |
Under Study |
Northern |
| Gordon Street Mixed-Use Development |
Not Available |
Under Study |
Northern |
| Gregory Development Road: Charters Towers - The Lynd, 1 km south of Airport Road - 8km north of East Paddy Creek, widen existing pavement |
7 |
Basic Engineering |
Northern |
| Gregory Development Road: Stage II Charters Towers - The Lynd, 2.7km north of One Mile Gin Creek - 300m south of Ryans Creek, widen existing pavement |
7 |
Basic Engineering |
Northern |
| Hayles Wharf: mixed-use development Flinders Street Townsville |
66 |
Construction |
Northern |
| Herveys Range Development Road: Townsville - Battery, Blackhawk Boulevard - Bohle River, duplicate 2 to 4 lanes |
14.52 |
Basic Engineering |
Northern |
| Hinchinbrook Cultural Complex: Development of a regional gallery, theatre, meeting and technology facilities, and agricultural history interpretation displays. The precinct will be connected to the Tyto Wetlands Centre, with an all-weather walkway, showcasing the rehabilitated wetlands and landscaped areas. |
12 |
Financial Close |
Northern |
| Indigenous Community Housing |
3.601 |
Committed |
Northern |
| Ingham Hospital redevelopment: new 32 bed Hospital, Emergency Department and a clinical operating suite. |
36.984 |
Construction |
Northern |
| IsaLink: Construction of a 1.1 km, 500 kV HVDC transmission line to connect the northwest Queensland to the grid |
900 |
Under Study |
Northern-North West |
| Itara at Riverway residential development |
140.5 |
Construction |
Northern |
| Jezzine Barracks and Kissing Point Redevelopment: start March 2009 |
45 |
Under Study |
Northern |
| Kalynda Chase Expected completion – 2013 |
200 |
Construction |
Northern |
| Lavarack Barracks Redevelopment Stage 4 (completion early 2011 ; new working accommodation for three units, two new Regimental Aid Posts and new Gymnasium) |
207.2 |
Basic Engineering |
Northern |
| Lucky Break Nickel, cobalt: heap leaching project |
10.8 |
Under Study |
Northern |
| Mount Moss Iron Ore Project: Mining operation to be an open pit. Design production is 1 Mt/a of high grade iron ore for shipment through the Townsville Port. Development delayed. |
30-50 |
On hold |
Northern |
| North Queensland Youth Detention Centre |
12.494 |
Committed |
Northern |
| North Ward Road, Townsville: Walker Street - Gregory Street, duplicate 2 to 4 lanes |
34 |
Basic Engineering |
Northern |
| Palm Island - Office Building |
13 |
Construction |
Northern |
| Powerlink (Ross to Yabulu South - transmission replacement) |
107 |
Construction |
Northern |
| Powerlink (Ross to Yabulu South - transmission reinforcement) |
46.5 |
Construction |
Northern |
| QR Electric Loco Fleet Upgrade Stages 1 & 2 Townsville |
181.051 |
In production |
Northern |
| Queensland Ambulance Townsville redevelopment project |
4.3 |
Construction |
Northern |
| RAAF Townsville – Troop Lift Helicopter Facilities: new facilities to support the operation, training and maintenance requirements for the Multi Role Helicopter 90 (MRH90) aircraft based in Townsville |
20 |
Construction |
Northern |
| Rocky Springs planned community 2009-2046 |
4500 |
Committed |
Northern |
| Single Living Environment and Accommodation Precinct (Single LEAP) – Townsville (to accommodate 540 personnel ; Completion 2012) |
175 |
Construction |
Northern |
| Townsville – 11th Brigade Facilities: upgrade and refurbishment of facilities |
6.4 |
Construction |
Northern |
| Townsville – C-17 Pavement Upgrade (Completion late 2011) |
25 |
Detailed Engineering |
Northern |
| Lavarack Barracks Townsville - Redevelopment Stage 4 (completion early 2011 ; new working accommodation for three units, two new Regimental Aid Posts and new Gymnasium) |
207.2 |
Construction |
Northern |
| Townsville – Multi-Role Helicopter Facilities (Completion late 2010) |
30 |
Detailed Engineering |
Northern |
| SkillsTech Australia - Townsville Campus: purpose-built trades training centre to be located at Bohle |
37.5 |
Basic Engineering |
Northern |
| Strand Central residential, commercial and community development |
70 |
Under Study |
Northern |
| Stuart Police Station |
5 |
Construction |
Northern |
| Sun Metals Zinc Refinery Expansion: Stage 2 development of the current Zinc refinery |
700 |
Financial Negotiations |
Northern |
| T1 – Townsville City (Stage 2): Stage 1—T1-Sturt Street tower—18 stories, 24 two-bedroom and 24 three bedroom apartments, five three-bedroom penthouses and two shops |
Not available |
Under Study |
Northern |
| Thuringowa City Council Wastewater Upgrade Program |
80-120 |
Under Study |
Northern |
| Townsville General Hospital Expansion: including 78 additional beds |
84 |
Basic Engineering |
Northern |
| Townsville Mens Correctional Centre: New extension to the existing prison |
142 |
Construction |
Northern |
| Townsville Ocean Terminal: A dedicated cruise terminal and wharf to attract cruise ships and military vessels, located on the Port Western Breakwater, adjacent to the Port of Townsville; An integrated residential and tourism development providing residential land parcels of mixed density for development. Planning approvals anticipated by end of year. Construction to commence in 2009. |
1000 |
Committed |
Northern |
| Townsville Port Access Road: direct link to the Flinders and Bruce Highways to the Port of Townsville in two sections: Section 1-Stuart Bypass - a new 2.5km road linking the Flinders Highway to the Bruce Highway. Section 2-Eastern Access Corridor - will be a new 7.5km road from the Bruce Highway to the Port of Townsville. |
190 |
Construction |
Northern |
| Townsville Port Berth 1 Services Jetty Duplication |
4.9 |
Committed |
Northern |
| Townsville Port Berths Upgrade Berths 7-10 |
58 |
Under Study |
Northern |
| Townsville & REEFVTS project |
3.5 |
Detailed Engineering |
Northern |
| Townsville Reinforcement of Supply |
36 |
Construction |
Northern |
| Townsville V8 Supercar Project: development of the race precinct race in the vicinity of Reid Park. |
59 |
Basic Engineering |
Northern |
| Townsville Womens Correctional Centre: design and construction of a new Centre |
130 |
Construction |
Northern |
| Townsville Woolcock Street Industrial Park |
125 |
Under Study |
Northern |
| Tropical Science and Innovation Precinct – James Cook University |
33 |
Detailed Engineering |
Northern |
| Tyto Precinct Project: forms the bulk of the $34.5M Ingham revitalisation strategy. It seeks to restore the historical and cultural significance of the CBD. The precinct would link the Tyto Interpretative Centre to the Lannercost Street business centre via a pedestrian promenade and all-weather walkway. |
21 |
Under Study |
Northern |
| Waterway Gardens master-planned community |
1000 |
Committed |
Northern |
| Wirralie gold: open cut heap leaching |
Not available |
Under Study |
Northern |