| Project |
Estimated project value |
Stage |
Location |
| Agate Creek Gold Project: open-cut/CIP development |
Not available |
Under Study |
Far North |
| Archer Point Windfarm: 120 MW wind power facility |
250 |
Under Study |
Far North |
| Baal Gammon Copper, Tin, Silver, Indium Project: open pit methods over a life of six to seven years, with the ore to be treated at the Jumna mill |
47 |
Construction |
Far North |
| Barron Gorge Capital Works: Capital works and modifications |
7 |
Basic Engineering |
Far North |
| Bruce Highway: Ingham to Innisfail |
172 |
Construction |
Far North-Northern |
| Bruce Highway: Innisfail to Cairns (Sheehy Road to Ray Jones Drive) |
150+ |
Committed |
Far North |
| Bruce Highway Mulgrave River, bridge construction |
50 |
Basic Engineering |
Far North |
| Bruce Highway Tully: Corduroy Creek - Banyan Creek, Tully, realign 2 lanes |
173 |
Basic Engineering |
Far North |
| Cairns Central Community Health Centre |
12.674 |
Basic Engineering |
Far North |
| Cairns Hospital Emergency Dept Additional Bed Capacity |
11 |
Detailed Engineering |
Far North |
| Cairns Base Hospital redevelopment |
446.3 |
Detailed Engineering |
Far North |
| Cairns Ports Cairns airport domestic terminal redevelopment |
192.8 |
Construction |
Far North |
| Cairns Ports AQIS office building |
6.35 |
Construction |
Far North |
| Cairns Ports airport landscaping |
4.023 |
Detailed Engineering |
Far North |
| Cairns Ports airport domestic short term covered parking |
3.778 |
Detailed Engineering |
Far North |
| Cairns Ports International Terminal Building Baggage reclaim hall expansion |
19 |
Detailed Engineering |
Far North |
| Cairns Ports International Terminal Building Departures retail, duty free walkthrough, specialty retail and landside retail |
24 |
Detailed Engineering |
Far North |
| Cairns Regional Performing Arts Centre |
85 |
Under Study |
Far North |
| Chalco Project: A bauxite mine and a beneficiation plant at Aurukun with a production of 4.8Mtpa of dry beneficiated bauxite and an alumina refinery on the east coast with a production capacity of 2.1Mtpa of alumina exported to China to be established within a five year period; a total investment of $2.9 billion including $810 million in mine and beneficiation plant and $2.1 billion in refinery; an estimated direct construction workforce of 3800 over a three year construction period including 700 for mine and beneficiation plant at Aurukun and 3100 for refinery at Bowen; and an estimated direct operational work force of 585, including around 105 for mine and beneficiation plant operation and 475 for refinery operation. The provisional proposal includes a mine and washing plant at Aurukun and a refinery on the east coast of Queensland worth a total of $2.92 billion. |
2930 |
Feasibility |
Far North-Mackay |
| Cleaner Seas Alliance Upgrade of Wastewater Treatment Plants Completion November 2009 |
120 |
Construction |
Far North |
| Coconut Grove NQ three-level apartment development |
43 |
Construction |
Far North |
| Department of Housing construction medium density Far North |
5.342 |
Ongoing |
Far North |
| Department of Housing construction detached houses Far North |
3.354 |
Ongoing |
Far North |
| Einasleigh Copper Project: a treatment facility adjacent to the open pit Kaiser Bill mine 6 km to the west of Einasleigh, which would produce a precious metal-rich copper concentrate. The production rate is projected to be 1 Mt/a in 2009, building to 1.5 Mt/a from 2010. |
80 |
Under Study |
Far North |
| Ella Bay Integrated Resort: a proposal to transform a 450 hectare operating cattle station into a fully master planned, residential resort community over a ten to fifteen year period. |
1400 |
Under Study |
Far North |
| Ely Bauxite Deposit: development of approx 50 million tonnes. |
300 |
Prefeasibility |
Far North |
| Embley South Bauxite Project: development of a new bauxite operation south of the existing mine and port. |
1053 |
Feasibility |
Far North |
| Erub (Darnley) Island Primary Health Care Centre |
6.875 |
Detailed Engineering |
Far North |
| HMAS Cairns: Upgrade of buildings and infrastructure to cater for introduction of Armidale class patrol boats. Start date: December 2008 |
76.3 |
Basic Engineering |
Far North |
| Hodgkinson (Northcote and Tregoora) Project: gold: The project comprises Northcote (joint venture with Jackson Gold and International Goldfields), 24 km west of Mareeba, and the wholly owned Tregoora goldfield, 103 km west-north-west of Mareeba. Further exploration is planned, with a view to eventual treatment at two centrally located mills. The company has carried out test work on the feasibility of using bacterial oxidation to treat the ore. |
Not available |
Under Study |
Far North |
| Hope Vale Primary Health Care Centre |
12.539 |
Detailed Engineering |
Far North |
| Indigenous Community Housing |
52.3 |
Ongoing |
Far North |
| Innisfail -Edmonton Line Replacement (Powerlink) |
83 |
Construction |
Far North |
| Isabella State School Stage 3 |
7.098 |
Construction |
Far North |
| Kareeya Capital Works |
8 |
Basic Engineering |
Far North |
| Kendall Kaolin Project |
120 |
Under Study |
Far North |
| Kennedy Highway |
14 |
Basic Engineering |
Far North |
| Lighthouse Quartz Project |
Not available |
Under Study |
Far North |
| Lotus Glen Correctional Centre: Extension to Lotus Glen high security prison in Mareeba. |
445 |
Detailed Engineering |
Far North |
| Mareeba Courthouse |
6.078 |
Committed |
Far North |
| Mareeba Police Station replacement station & watchhouse |
10.355 |
Detailed Engineering |
Far North |
| Mareeba new office building |
15.5 |
Basic Engineering |
Far North |
| Mourilyan Silica Sand Project: silica sand dry-mining operation and wash plant. The project is capable of producing and exporting at least 200,000 t/a of highgrade silica sand. Mine life is expected to be more than 30 years. |
Not available |
Under Study |
Far North |
| Metricon Sea Haven Marina Development |
130 |
Construction |
Far North |
| Mungana Polymetallic (Zinc, Lead, Silver, Copper and Gold) Project: construction of a mill |
90 |
Construction |
Far North |
| Oceans Edge residential resort |
350 |
Construction |
Far North |
| NORNICO Nickel Project: The proposed project will involve shallow pit mining from five pits at a rate of 1.5 Mt/a to produce about 10,000 t/a of nickel and 435 t/a of cobalt. Nickel and cobalt is to be recovered by a heap leaching process. The company aims to build a sulphuric acid plant and power station using imported sulphur for both. The vision is for a project life of 20 years. The concentrate product could be trucked to the Yabulu nickel refinery or exported. Construction 2nd Qtr 2010. |
350 |
Under Study |
Far North |
| Peninsula Development Road: Coen - Weipa, construct to sealed standard on various sections |
21.379 |
Basic Engineering |
Far North |
| Pisolite Hills: development of a greenfield bauxite mine producing eight to twelve million tonnes of run of mine bauxite ore per year for export through a loading facilty in Port Musgrave with construction of a beneficiation plant and tailings dam on the site together with a camp, haul road, barge loading facility and associated infrastructure 2010-11. |
Not available |
EIS |
Far North |
| Police housing Cooktown & Weipa |
2.8 |
Detailed Engineering |
Far North |
| Police housing Bamaga & Kowanyama |
3 |
Detailed Engineering |
Far North |
| Pormpuraaw various roads, restoration works |
4 |
Ongoing |
Far North |
| Port Douglas Police Station replacement station |
3 |
Committed |
Far North |
| Powerlink (Tully-Innisfail transmission line) |
87.2 |
Construction |
Far North |
| Powerlink (Innisfail-Edmonton line replacement) |
94.7 |
Construction |
Far North |
| Redlynch State College |
18.2 |
Construction |
Far North |
| Saibai Island Primary Health Care Centre |
5.685 |
Construction |
Far North |
| Thursday Island Chronic Disease Centre |
30.015 |
Tendering |
Far North |
| Thursday Island New Office Building |
13.5 |
Basic Engineering |
Far North |
| Tropical North Queensland Institute of TAFE - Cairns Campus |
26 |
Committed |
Far North |
| Watershed tungsten project: produce a concentrate containing 4,000 t of contained WO3 per year, with a mine life of at least ten years and a mining rate of between 1.5 Mt/a and 1.75 Mt/a. This figure would represent approximately 7% of the entire world tungsten use. The deposit comprises disseminated fine to coarse-grained scheelite mineralisation, which is potentially amenable to a large open-pit mining operation |
50 |
Under Study |
Far North |
| Weipa Bauxite Mine Expansion of existing mine from 18.2 million tons per year to 35. Construction to commence late 2009, early 2010 with production in early 2013. |
1000 |
Feasibility |
Far North |
| Weipa Hospital redevelopment |
45.763 |
Detailed Engineering |
Far North |
| Wallamurra Tower Completion December 2008 two towers (five- and seven-storey) 26 apartments and four commercial suites and one restaurant |
20 |
Construction |
Far North |
| Warraber Island Primary Health Care Centre |
4.777 |
Detailed Engineering |
Far North |
| Western Cape College Weipa Stage 3 |
6.3 |
Construction |
Far North |
| William McCormack Government Offices: Stage 1: Phase 1 of a 2 stage building 9400sqm net lettable area over 9 levels and parking for 200 cars. It will be 5 Green Star Rated, in design, interior fitout and as built with the Green Building Council of Australia. |
79.5 |
Detailed Engineering |
Far North |
| Woree Business & Industry Park - Stages 2 & 3 |
6 |
Basic Engineering |
Far North |
| Yarrabah Primary Health Care Centre |
15.774 |
Detailed Engineering |
Far North |