Central Queensland projects (inc. Fitzroy and Wide Bay-Burnett Regions)

If you are a Queensland manufacturer or related service provider looking for major project work make sure you are registered with ICN (QLD) or your existing registration is up to date.

If you are a Queensland small business in the building and construction industry, such as electrician, bricklayer, landscaper or builder, especially in regional Queensland, there is no need to register with ICN (Qld), just keep an eye out for project or opportunity briefing in your region.

If you are a buyer and need further assistance to optimize your project in Queensland make sure you contact ICN (QLD).

Project Estimated project value Stage Location
12 and 16 Cylinder Loco Overhauls - Coal 80 In production Fitzroy
15 x 4000 Class Locomotives (Downer EDi Rail project) 93.062 In production Wide Bay-Burnett
24 Locos upgrade to 2250 Class 57 In production SE Queensland
15 New Diesel Locomotives (4100 Class) (Downer EDi Rail project) 87.395 In production Wide Bay-Burnett
Aircraft Factory – Kingaroy Stages 1, 2, 3 have been completed, with stages 4 and 5 being completed before 2010 26 Construction Wide Bay-Burnett
Alpha Coal Project: Hancock Prospecting. The Project will initially be a 30Mtpa open cut coal mine, with the potential for developing significant underground reserves. The expected capital expenditure for The Project is $7.5 billion, consisting of $3 billion for the construction of the mine, $2.5 billion for rail and $2 billion for port development. 3,000
(mine)

2,500
(railway)

2,000
(port)
Pre-feasibility Central West
Aroona to Duaringa Duplication: expected completion 2009-10 35 Construction Fitzroy
Augustus The 31.6 ha estate will comprise 324 Villa World brand house and land packages 123 Construction Wide Bay-Burnett
Australian Seamless Tube Project (Boulder Steel): (inc. pig iron plant) New project, awaiting development approval 536 Finance pending Fitzroy
Bay Central Shopping Centre: Office, restaurant and shops (shopping centre) 40 Application Wide Bay-Burnett
Beach House Hotel Development: 342 The Esplanade, Scarness. Three eight-storey buildings consisting of 91 units. Not available application lodged – March 2007 Wide Bay-Burnett
Belvedere underground: New project, pre-FS underway, expected start-up 2012 1000 Feasibility Fitzroy
Blackwater to Burngrove Rail Duplication 43 Construction Fitzroy
Bluff to Blackwater Rail Duplication 59 Construction Fitzroy
Bouldercombe to Pandoin (Powerlink) 44 Construction Fitzroy
Boyne - Smelter Expansion: New Cranes for lines 1&2 and and new carbon bake furnace for lines 1&2. Start 4th Qtr 2009. 385 Committed Fitzroy
Boyne Tannum Country Club Redevelopment 81.5 Development approval pending Fitzroy
Brigalow to Tarong Rail Line Subject to feasibility studies and commercial negotiations on alternative coal source options 500 Under Study Darling Downs-Wide Bay-Burnett
Bruce Highway – Gympie: Gympie urban section, Kidgell Street-Pine Street, duplicate 2 to 4 lanes. Stage 2 construction commenced in May 2008 and is expected to be finished by early 2009 71 Construction SE Queensland
Bruce Highway Upgrade: Cooroy to Gympie 3300 Basic Engineering SE Queensland- Wide Bay Burnett
Bundaberg Hospital Expansion: additional 20 bed medical ward, a new maternity unit and new emergency department 41.1 Detailed Engineering Wide Bay-Burnett
Bundaberg Reinforcement of Supply 22 Basic Engineering Wide Bay-Burnett
Bundaberg Ring Road: Construct to new sealed 2 lane standard 92 Basic Engineering Wide Bay-Burnett
Callemondah 3rd Spur 40.506 Construction Fitzroy
Callide Power Station: - CS Energy property, plant & equipment 109.998 Ongoing Fitzroy
Callide Oxyfuel Project: Callide A Power Station. Aims to prove how two technologies can be combined to achieve near zero greenhouse gas emissions from coal-fired electricity generation. The demonstration project will also assess potential commercial applications of the technologies. Six partners are collaborating on the Callide Oxyfuel Project and financial support has been sourced from these organisations, along with the Australian Government's Low Emissions Technology Demonstration Fund, the Australian Coal Association's COAL21 Fund and the Queensland Government. 206 Construction Fitzroy
Capricorn Green (The Observatory): Master-planned residential development—1,450 lots. Two commercial precincts and historic activity centre (conference and tourist accommodation) 600 Under Study Fitzroy
Capricorn Highway Bushley new bridge 14.3 Committed Fitzroy
Cascade Gardens Residential, Commercial and Sports Centre Development 350 Construction Fitzroy
Cement Australia: new cement mill for completion early 2009 50.6 Construction Fitzroy
Central Queensland Institute of TAFE - Rockhampton 6.85 Basic Engineering Fitzroy
Clermont Coal Deposit (Rio Tinto Coal Australia - development of the $950 million, 190 million tonne thermal coal deposit in Clermont), expected start-up 2010 950 Construction Fitzroy-Mackay
Cook underground coal mine: expansion 30 Construction Fitzroy
Coral Cove master-planned community 153 Construction Wide Bay-Burnett
Curragh opencut: Expansion & creek diversion, FS, expected start-up 2011 Not available Under Study Fitzroy
Curtis Island Beach Resort Staged development of 164 beachside apartments and villas 25 Construction Fitzroy
Customs House Site Redevelopment Gladstone 20 Under Study Fitzroy
Dawson Complex Coal Mine: redevelopment and expansion of the former Moura Mine. Saleable coal production will be progressively increased in stages to about 12.7 Mt/a - a target expected to be reached by late 2007 or early 2008. The expansion includes the construction of a new coal handling and preparation plant, the installation of new mining equipment and the upgrading of the coal transport fleet 1000 Construction Fitzroy
Dawson Highway: deviation at the Calliope Range start May 2009 70 Detailed Engineering Fitzroy
Disability Services Queensland innovative housing Maryborough West 3.097 Construction Wide Bay-Burnett
Department of Housing construction medium density Fitzroy 7.403 Committed Fitzroy
Department of Housing construction medium density Wide Bay-Burnett 7.127 Committed Wide Bay-Burnett
Electric Loco Upgrade Program 172 In production Fitzroy-Wide Bay Burnett
Ensham Central Coal Project: staged expansion of the Ensham open-cut mine to increase saleable coal production from its present level of approximately 7 Mt/a to 13 Mt/a 140 Construction Fitzroy-Mackay
Ensham Central underground Expansion, FS underway, expected start-up 2012 700 Under Study Fitzroy-Mackay
Fisherman’s Landing Expansion Gladstone Port Stages 1 and 2 161 EIS Fitzroy
Fraser Coast Marine Industrial Park 20 Financial Close Wide Bay-Burnett
Fraser Shores Medical Precinct Hospital, 2 medical centres, education facility and dance studio, nursing home and motel accommodation Started – 2004. Total completion – 2010 100 Construction Wide Bay-Burnett
Galilee Coal project (Hancock): open cut thermal coal mine with rail and port facilities in the Galilee Basin 7500 Feasibility Central West-Fitzroy
Galilee Coal project (Waratah): coal mine, railway and port facility in Central Queensland to export high volatile, low sulphur, steaming coal to international markets. Processed coal will be transported by a new 495 km rail system from the Galilee Basin to a planned export port facility on the Central Queensland coast. Waratah Coal will construct a state-of-the-art, heavy haul, standard gauge rail system to support 21,000 tonne train units. The system will be equipped with dual gauge rail from the Bowen Basin mining area to the port to accommodate third party users from the Bowen Basin region. The port will have an initial capacity of 50 million tonnes of coal per year and will accommodate a full range of bulk carriers including the new 350,000 DWT Chinamax class vessel. As the rail and port system reaches full annual export capacity of 50 Million tonnes, approximately 50 trains per week will transport coal to the port. Depending on vessel size, approximately 8 to 10 bulk carriers will enter the port weekly with a range of destinations including Japan, Korea, China, Taiwan, other Asian nations and India. Construction 2010. 1,000
(mine)

2,000
(railway)

1,500
(port)
Under Study Central West-Fitzroy
Gladstone Area Water Board Fitzroy Pipeline: The pipeline will run underground from the Fitzroy River via an easement, through the proposed Stanwell – Gladstone Infrastructure Corridor (SGIC) and Gladstone State Development Area (GSDA), before finally joining GAWB’s raw water reticulation system. Construction 2009-11. 372.925 Technical Investigation Fitzroy
Gladstone Community, Mental and Oral Health consolidation 15.95 Construction Fitzroy
Gladstone LNG Project (Fisherman’s Landing): A natural gas liquefaction plant and associated infrastructure and facilities 400 Under Study Fitzroy
Gladstone LNG ( Santos): LNG liquefaction and export facility development (comprising LNG facility and associated infrastructure including bridge and access road) on Curtis Island, near Gladstone. 7700 At EIS stage Fitzroy
Gladstone Pacific Nickel Project: construction of a nickel ore mine and a beneficiation plant to concentrate ores at Marlborough, and a large nickel/cobalt refinery at Gladstone.  The refinery will be a modern, ‘fourth generation’ high pressure acid leaching (HPAL) facility.  Provision for importation and refining of additional high grade laterite ores from the South West Pacific through the existing and planned future facilities, available at the deepwater port of Gladstone, are included in the Company’s plans. Construction Stage 1 mid 2009. 4000 Basic Engineering Fitzroy
Gladstone Ports RG Tanna coal terminal: ongoing projects 109.992 Ongoing Fitzroy
Gladstone Ports RG Tanna coal terminal dust: suppression initiatives 7.846 Ongoing Fitzroy
Gladstone Ports Wiggins Island Coal Terminal feasibility study 30 Feasibility Fitzroy
Gladstone Ports Wiggins Island Coal Terminal Stage 1: require timely contract Committed by Users to initiate construction, June 2012 completion 1358 Feasibility Fitzroy
Gladstone Ports Wiggins Island Coal Terminal Stage 2: require timely contract Committed by Users to initiate construction, June 2016 completion 1429 Possible Fitzroy
Gladstone Ports Wiggins Island Coal Terminal Stage 3: require timely contract Committed by Users to initiate construction, June 2020 completion 1027 Possible Fitzroy
Gracemere Shoppingworld Start late 2008-completion 2009-10 30 Construction Fitzroy
Gladstone State Development Area - Service Infrastructure 26 Basic Engineering Fitzroy
Great Barrier Reef International Resort Total completion – around 2015 80 Construction Fitzroy
Gympie Pines Fairway Villas project completion – end of 2008 40 Construction Wide Bay-Burnett
Harvey Bay Road 29.5 Construction Wide Bay-Burnett
Hummock Hill Island Development Project: Proposed construction of a residential and tourism development to accommodate a population of approximately 4,000 on Hummock Hill Island. The proposal also includes a golf course and an educational facility, the details of which are yet to be determined. 1,125 (over 15 years) EIS Fitzroy
Keppel Bay Vista apartments and mixed commercial 36 Under Study Fitzroy
Keppel Views 20-year master-planned, multistage development of 1,600 residential blocks of land Yeppoon 1800 Construction Fitzroy
Kestral Expansion (Rio Tinto - new automated run of mine stockpile system and a seven kilometre overland conveyor to the existing coal handling and preparation plant), expected start-up 2011 1300 Detailed Engineering Fitzroy-Mackay
Leichardt Highway: Westwood - Taroom, Dawson River - Twelve Mile Creek, widen existing pavement 6 Basic Engineering Fitzroy – Darling Downs
Leichardt Highway 2: Westwood - Taroom, north of Dawson Park Road, widen existing pavement 7 Basic Engineering Fitzroy – Darling Downs
Lime Dosing Plant (Dept Mines and Energy) 6.394 Construction Central
Maryborough Coal Mine: new open cut mine construction 2009 50 Under Study Wide Bay-Burnett
Maryborough - Hervey Bay Road: Torbanlea turnoff - McNally Street, duplicate 2 to 4 lanes 26 Basic Engineering Wide Bay-Burnett
Meandu Mine Void Project: Disposal of ash products 36.6 Under Study Wide Bay-Burnett
Mettrip Rollingstock (24 x 3-car Units) 289 In production Wide Bay-Burnett
Monto coal mine (stage 1): new project 35 Under Study Wide Bay-Burnett
Moranbah to Gladstone Gas Pipeline Project (Central Qld Gas Pipeline): The 440 km long high-pressure gas pipeline will be built, owned and operated by Enertrade, and is intended to provide a strategic link for coal seam gas supply between the Northern Bowen Basin and Gladstone. The pipeline will also provide interconnection with the Queensland gas pipeline network, giving north Bowen Basin gas access to additional Queensland markets. 400 Under Study Mackay-Fitzroy
Mount Cannindah Copper, Gold Project Expected production – 2009 70 Under Study Fitzroy
Mt Morgan Police Station upgrade 2.037 Construction Fitzroy
Moura Link—Aldoga Rail Project: Construction of new rail maintenance and provisioning facilities in Aldoga. Expected start 2009 and completion mid 2012 500 Basic Engineering Fitzroy
Murgon Police Station replacement station/watchhouse stage 1 8 Basic Engineering Fitzroy
Nambour Shopping Centre: Development of the Morton Sugar Mill-2008 to 2012 111 Construction Wide Bay-Burnett
New Saraji underground: New project, EIS process – terms of reference, expected start-up 2011 1000 Under Study Mackay-Fitzroy
Nikenbah Wastewater Treatment Plant: The facility comprises a 10,000 equivalent dwelling wastewater treatment plant (WTP) intended to service Hervey Bay’s western urban catchment for the period to 2023. The design capacity of the plant is 4.8ML per day (average dry weather flow) and will operate using a membrane bioreactor (MBR) process to ensure a high standard of treatment and enhancing reuse opportunities. 35.6 Construction Wide Bay-Burnett
North Coast Line Re-railing: Nambour - Parana 11 Detailed Engineering Wide Bay-Burnett
North Rockhampton Reinforcement of Supply (Berserker) 19 Basic Engineering Fitzroy
Orica Australia: caustic storage tank completion Feb 2009 20 Construction Fitzroy
QMAG Upgrade (Queensland Magnesia): Installation of third multiple hearth furnace, milling upgrade, storage and packaging 42 Committed Fitzroy
QR Additional Citytrain Rollingstock 296.837 In production Wide Bay-Burnett
QR MetTRIP – Additional Citytrain Rollingstock 289.456 In production Wide Bay-Burnett
Queensland Gas Pipeline Expansion 112 Committed Fitzroy
Queensland Health Rockhampton staff accommodation 10 Construction Fitzroy
Queensland Curtis LNG Project (BG-QGC): the expansion of QGC’s coal seam gas (CSG) operations in the Surat Basin to provide gas for two of the three LNG trains and gas for domestic markets; the development, construction and operation of a main gas pipeline of approximately 380 km, capable of supplying gas for three LNG trains, together with a network of gas connection pipelines, to link the QGC gas fields and other nearby CSG resources to the LNG plant; the development, construction and operation of an LNG processing plant and export facility, to be located in the Gladstone area, with an ultimate capacity of up to 12 mtpa. Nominally this will comprise three LNG trains, each of 3 to 4 mtpa production capacity. 8000 At EIS stage Fitzroy
Ramada Resort Hervey Bay Construction started – January 2007. Expected completion – 2008 100 Construction Wide Bay-Burnett
Rockhampton Hospital Improvement: extensions and refurbishment of the main medical/clinical services building, new buildings and associated demolition and external works 74 Construction Fitzroy
Rockhampton Major Hotel and Apartment Development Major hotel and 233 apartments, restaurant and conference facility 100 Committed Fitzroy
Rookwood Weir and Eden Bann Weir Government has committed to construction of the new infrastructure by 2011 72 (Rookwood)
71.33
(Eden)
Committed Fitzroy
Sansara Resort & Spa: To be built over three stages and features 107 residential apartments, including four bungalows, 18 retail shops, theatre and conference centre, swimming pool, gym and various resident facilities. 200 Construction Fitzroy
Stanwell Power Station Turbine and generator upgrade 87 Basic Engineering Fitzroy
Stanwell Power Station (low nox burners) 36 Construction Fitzroy
Stanwell to Wycarbah duplication: Gracemere to Wycarbah 71.5 Construction Fitzroy
Sun LNG Plant (Sunshine Gas): 500,000 tonne-a-year LNG plant 450 At EIS stage Fitzroy
Surat Basin Railway (Southern Missing Link): 207km link the towns of Wandoan and Banana to the Port of Gladstone. Railway is likely to initially consist of single track with passing loops at approximately 25km intervals that will be able to accommodate trains approximately 2.4km in length. Construction will be undertaken with multiple work fronts and require a workforce currently estimated at an average of 400-600 personnel over a duration of approximately two and a half years. 1200 EIS Darling Downs-South West-Fitzroy
Rolleston opencut: Expansion in progress 540 Construction Fitzroy
Tarong Energy (Tarong Power Station - low nox burners) 31.37 Construction Wide Bay-Burnett
Tarong Energy (Tarong Power Station - instrumentation & control systems upgrade) 46.178 Construction Wide Bay-Burnett
Tarong Power Stations Long-Term Fuel Supply – Kunioon The new Kunioon mine will be constructed in time to succeed Meandu Mine when it is no longer commercially viable. A 16 kilometre coal transport conveyor system will link the new mine to the power station. 845.985 Basic Engineering Wide Bay-Burnett
The Edge Apartments Mixed-use development incorporating restaurant, 41 dual key apartments, and 36 residential apartments. Completion – December 2008. 21 Committed Fitzroy
Togara North underground New project, FS completed 350 Under Study Fitzroy
Transpacific Industries Group: regional waste management facility 20+   Fitzroy
Traveston Crossing Dam Stage I: Mary River. Staged construction. Stage 1 completion by end of 2011 to delivering 70,00Ml per annum. Stage 2, $250M, raising of the Borumba Dam by 2015. Stage 3, completion of Traveston Dam by 2035. 1592 Under Study Wide Bay-Burnett
Urangan Boat Harbour Development: expansion of the harbour to the south of the existing breakwater, to include a new marina, with a minimum of 200 berths; a defined gateway to the boat harbour, through a major upgrade of Miller Street to create a boulevard entrance; redevelopment of existing car park and caravan park lots for a mix of tourism, commercial and residential infrastructure, and public car parking; improved public amenity, with a green corridor. Construction 2009 with completion by 2011. 800 Under Study Wide Bay-Burnett
VNQ Coal Wagon Overhauls (QR) 21.188 In production Fitzroy
Walloon Coal Seam gas Project: Development of Origin Energy’s Walloon coal seam gas fields in order to supply Rio Tinto Alluminium Yarwun refinery 260 Basic Engineering Fitzroy
Wateranga Industrial Minerals Project: mining a multimineral eluvial resource 85 Under Study Wide Bay-Burnett
Waterfront 105 hotel suites with restaurant, shops and gymnasium, meeting rooms and swimming pool and 36 apartments 39 Under Study Wide Bay-Burnett
Westwood to Wycarbah Duplication 32 Construction Fitzroy
Wiggins Island balloon loop 22 Construction Fitzroy
Wonbindi Coal Project: New project, pre-FS underway, expected start-up 2011 220 Under Study Fitzroy
Woolooga SVC (Powerlink) 39 Construction Fitzroy
Yamala underground New project, pre-FS underway, construction 2010, expected start-up 2012 400 Under Study Fitzroy
Yarwun Alumina Refinery Stage 2 (Yarwun 2 will focus on the construction of the five alumina process areas: tube digestion, precipitation, filtration, clarification and calcination. Major and minor facilities utilised in these process areas will be replicated.) 2200 Construction Fitzroy
Yeppoon Hospital Redevelopment 20.6 Construction Fitzroy
Yeppoon Pipeline Start – early 2008 completion Dec 2009. 33 kilometre water pipeline to supply water to urban users on the Capricorn Coast. Construction of the pipeline will also have significant environmental benefits as it will remove the need to extract water supplies from the Sandy Creek coastal dune system in the future. 50 Construction Fitzroy
Yeppoon Police Station replacement station 8.618 Detailed Engineering Fitzroy
Yeppoon Reinforcement of Supply 16 Basic Engineering Fitzroy
Zerogen Clean Coal Power Station Project Stage 1: (clean coal power plant integrating coal gasification with carbon capture and storage to produce low emission baseload power). Feasibility study and geosequestration drilling program to be completed – end 2008. EIS early 2009. Construction 2010. Commissioning 2012. 1,700-1,900 Under Study Fitzroy